Quick answers
What is Imperial Mall?
Imperial Mall is an approved building project in Wadhwan (M), Wadhwan, Surendranagar, Gujarat. The site covers 3 acres.
Who is building it?
The applicant is Imperial Buildcon.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 7 Feb 2023), as of 27 Nov 2026.
Where is it?
In Wadhwan (M), Wadhwan, Surendranagar, Gujarat.
How big is it?
It has a stated cost of ₹71.6 crore and a site of 3 acres.
When was it filed?
The application was filed on 7 Feb 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 Feb 2023 |
| Application filed | 7 Feb 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Imperial Buildcon |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹71.6 crore |
| Village / locality | Wadhwan (M) |
| Taluk / tehsil | Wadhwan |
| District | Surendranagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-00508 |
In context
8 applications in Surendranagar since January 2022 are in the same category (Buildings & townships): 3 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Wadhwan (M), Wadhwan, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Synthetic Organic Chemicals (Reactive Dyes)manufacturing… — environmental approval granted, 1.3 km away
- 90mm Dia PE GAS PIPELINE for Laid on Both Side of SH-17 for Future… — forest land use approved, 2.6 km away
- 90mm Dia PE GAS Pipeline for laid on Both Side of SH-17 for BAPS Temple… — forest land use approved, 4.7 km away
- Project of Integrated Water Supply Scheme Phase - II (PART-A) and S2 S3 (Vadod… — more information requested, 9 km away
- Project of Integrated Water Supply Scheme Phase - II (PART-A) and S2 S3 (Vadod… — lapsed, 9 km away
- Industrial project by M/s. T4 Tapes Pvt. Ltd. — environmental approval granted, 9.3 km away
- Shri Mulrajsinh Ghanshyamsinh Parmar — lapsed, 9.3 km away
- Shi Mathurbhai Valjibhai Sakriya — environmental approval granted, 10 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.