Quick answers
What is this project?
Expansion of Carbon Black Manufacturing Facility from 1.65 LTPA to 1.926 LTPA (EC Product) under Para 7 (ii) (a) from 20% to 40% is an approved industrial project in Padhar, Bhuj, Kachchh, Gujarat. The site covers 299.6 acres.
Who is building it?
The applicant is Balkrishna Industries Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 Jul 2024), as of 27 Nov 2026.
Where is it?
In Padhar, Bhuj, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹6,087.3 crore and a site of 299.6 acres.
When was it filed?
The application was filed on 13 May 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Jul 2024 |
| Application filed | 13 May 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Balkrishna Industries Limited |
| Land area | 299.6 acres (121.3 ha) |
| Project cost | ₹6,087.3 crore |
| Village / locality | Padhar |
| Taluk / tehsil | Bhuj |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-01203 |
In context
160 applications in Kachchh since January 2022 are in the same category (Industry): 104 approved, 40 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 299.6 acres, this one is larger than 79% of them.
62 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Padhar, Bhuj, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Carbon Black Manufacturing Facility (from 1.92 LTPA to 8 LTPA),… — returned to applicant, 400 m away
- "EC Application under Para 7(ii) for Carbon Black Manufacturing Facility (from… — returned to applicant, 500 m away
- Expansion of Carbon Black Manufacturing Facility (from 1.92 LTPA to 8 LTPA),… — withdrawn, 500 m away
- Expansion of Carbon Black Manufacturing Facility (from 1.92 LTPA to 8 LTPA),… — environmental approval granted, 500 m away
- Expansion of Carbon Black Manufacturing Facility (from 1.92 LTPA to 8 LTPA),… — cleared for impact study, 500 m away
- Expansion of Carbon Black Manufacturing Facility (6.6 LTPA to 8.0 LTPA) with… — returned to applicant, 550 m away
- Diversion of Forest land to construct of approach road in favour of BKT TYRES… — forest land use approved, 600 m away
- "EC Application under Para 7(ii) for Carbon Black Manufacturing Facility (from… — environmental approval granted, 800 m away
More from Balkrishna Industries Limited in Kachchh
- Expansion of Carbon Black Manufacturing Facility (6.6 LTPA to 8.0 LTPA) with… — returned to applicant
- "EC Application under Para 7(ii) for Carbon Black Manufacturing Facility (from… — environmental approval granted
- "EC Application under Para 7(ii) for Carbon Black Manufacturing Facility (from… — returned to applicant
- "EC Application under Para 7(ii) for Carbon Black Manufacturing Facility (from… — returned to applicant
- Expansion of Carbon Black Manufacturing Facility (from 1.92 LTPA to 8 LTPA),… — withdrawn
- Balkrishna Industry Township — environmental approval granted
All 13 Balkrishna Industries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.