WithdrawnIndustry · Kachchh, Gujarat

Expansion of Carbon Black Manufacturing Facility (from 1.92 LTPA to 8 LTPA), Tire Manufacturing Facility (from 3.24 LTPA to 6 LTPA); Power Plant (from 40 MW to 240 MW); Mould/Drum Production (from 360 Nos. /Annum to 5000 Nos / Annum) and Establishment of Dip Roll Fabric (Man Made Fibre) for 75,000 Ton Per Annum; Wheel Rim for 1000 nos. Per day

Expansion of Carbon Black Manufacturing Facility (from 1.92 LTPA to 8 LTPA), Tire Manufacturing Facility (from 3.24 LTPA to 6 LTPA); Power Plant (from 40 MW to 240 MW); Mould/Drum Production (from 360 Nos. /Annum to 5000 Nos / Annum) and Establishment of Dip Roll Fabric (Man Made Fibre) for 75,000 Ton Per Annum; Wheel Rim for 1000 nos. Per day is a withdrawn industrial project in Padhar, Bhuj, Kachchh, Gujarat. The site covers 753.1 acres. Its stated project cost is ₹19,400 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 16 Oct 2025).

See it on the live map All projects in Kachchh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Carbon Black Manufacturing Facility (from 1.92 LTPA to 8 LTPA), Tire Manufacturing Facility (from 3.24 LTPA to 6 LTPA); Power Plant (from 40 MW to 240 MW); Mould/Drum Production (from 360 Nos. /Annum to 5000 Nos / Annum) and Establishment of Dip Roll Fabric (Man Made Fibre) for 75,000 Ton Per Annum; Wheel Rim for 1000 nos. Per day is a withdrawn industrial project in Padhar, Bhuj, Kachchh, Gujarat. The site covers 753.1 acres.

Who is building it?

The applicant is Balkrishna Industries Limited.

Has it been approved?

No. The application was withdrawn on 16 Oct 2025, so it is no longer under consideration.

Where is it?

In Padhar, Bhuj, Kachchh, Gujarat.

How big is it?

It has a stated cost of ₹19,400 crore and a site of 753.1 acres.

When was it filed?

The application was filed on 16 Oct 2025.

Project details

Official titleExpansion of Carbon Black Manufacturing Facility (from 1.92 LTPA to 8 LTPA), Tire Manufacturing Facility (from 3.24 LTPA to 6 LTPA); Power Plant (from 40 MW to 240 MW); Mould/Drum Production (from 360 Nos. /Annum to 5000 Nos / Annum) and Establishment of Dip Roll Fabric (Man Made Fibre) for 75,000 Ton Per Annum; Wheel Rim for 1000 nos. Per day with associated Tire ancillary units
StatusWithdrawn
Status since16 Oct 2025
Application filed16 Oct 2025
Approval soughtEnvironmental approval
Application typeAmendment
SectorIndustry
ApplicantBalkrishna Industries Limited
Land area753.1 acres (304.8 ha)
Project cost₹19,400 crore
Village / localityPadhar
Taluk / tehsilBhuj
DistrictKachchh
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-08394

In context

160 applications in Kachchh since January 2022 are in the same category (Industry): 104 approved, 40 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 753.1 acres, this one is larger than 89% of them.

68 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Padhar, Bhuj, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Balkrishna Industries Limited in Kachchh

All 13 Balkrishna Industries projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.