Quick answers
What is Balkrishna Industry Township?
Balkrishna Industry Township is an approved residential project in Padhar, Bhuj, Kachchh, Gujarat. It plans 898 units in 93 towers of up to 2 floors on 90.4 acres.
Who is building it?
The applicant is Balkrishna Industries Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 30 Aug 2025), as of 27 Nov 2026.
Where is it?
In Padhar, Bhuj, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹320 crore and a site of 90.4 acres.
When was it filed?
The application was filed on 28 May 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 Aug 2025 |
| Application filed | 28 May 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Balkrishna Industries Limited |
| Use | Residential |
| Units | 898 |
| Towers | 93 |
| Floors (tallest) | 2 |
| Parking spaces | 1,392 |
| Land area | 90.4 acres (36.6 ha) |
| Built-up area | 1,48,407 m² (15,97,438 sq ft) |
| Plot area | 3,65,736 m² (39,36,746 sq ft) |
| Project cost | ₹320 crore |
| Village / locality | Padhar |
| Taluk / tehsil | Bhuj |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-07409 |
What the filings say
What is planned
Balkrishna Industries Limited proposes to develop a residential township on 36.57 hectares (90.37 acres) of land in Paddhar village, Bhuj. The project, known as Balkrishna Industry Township, is designed to provide housing for industrial activities in the region. The applicant's project report states that the development will have a total built-up area of 1,48,407 square metres, with a ground coverage of 79,158 square metres.
The township is divided into two main sections, the West Block and the East Block, consisting of G+2 floor buildings with a maximum height of 12.75 metres. The planned residential units include:
- 3 BHK Flats: 216 units (9 blocks with 24 flats each)
- 2 BHK Flats: 624 units (26 blocks with 24 flats each)
- Row Houses: 50 units (3 BHK)
- Villas: 8 units (3 BHK)
Ancillary facilities include a club and a restaurant with a kitchen. During the operation phase, the township is expected to accommodate a total population of 5,560 people, including 4,764 residents, 100 club members, 100 restaurant patrons, 496 visitors, and 100 staff members.
Layout and design
The project layout allocates 33.02% of the total plot area to green space, covering 1,20,750 square metres. Roads, open areas, and surface parking will occupy 1,65,828 square metres (45.34% of the plot). The West Block is the larger of the two residential clusters, housing the majority of the flats, row houses, and villas. The East Block will contain 10 blocks of 2 BHK flats.
Parking provisions are planned for 1,495 Equivalent Car Spaces (ECS), exceeding the required 1,482 ECS. This includes 16 spaces for villas, 50 for row houses, and common parking slots for both blocks. The applicant has committed to providing electric vehicle (EV) charging for 20% of the parking spaces.
Land and surroundings
The site is located on the Bhuj-Bhachau Road (State Highway 42). It is approximately 8.44 km from Ratnal Railway Station and 19.53 km from Bhuj Airport. The applicant states that the site is currently vacant with no existing construction. Most land parcels are owned by the company, while survey number 380/2 is private land for which a Letter of Intent (LOI) is being obtained. Applications for Non-Agricultural (NA) use have been submitted for several survey numbers.
Water, power and access
Water: During operation, the total water requirement is estimated at 1,316 kilolitres per day (KLD). Fresh water (805 KLD) will be sourced from the Gujarat Water Supply & Sewerage Board (GWSSB) or Gujarat Water Infrastructure Limited (GWIL). The project will generate 537 KLD of wastewater, to be treated in two on-site Sewage Treatment Plants (STPs) with capacities of 550 KLD and 200 KLD using Moving Bed Biofilm Reactor (MBBR) technology. Treated water (511 KLD) will be reused for gardening and flushing, with no discharge into public sewer lines.
Power: The total power load is 3,562 kVA, to be supplied by Paschim Gujarat Vij Company Ltd (PGVCL) and a captive power plant. Backup will be provided by three diesel generator (DG) sets (2 x 850 kVA and 1 x 500 kVA). Solar panels will provide 71 kVA of renewable energy, and all street lights will be solar-powered.
Environmental safeguards
To manage solid waste, the project will generate an estimated 2,309 kg/day. Biodegradable waste (1,386 kg/day) will be processed in an organic waste converter to produce manure for landscaping. Non-biodegradable waste (923 kg/day) will be sent to authorized recyclers. Rainwater collection is planned via two collection ponds with a combined capacity of 400 cubic metres, as groundwater recharge was deemed unfeasible due to the high water table.
The applicant proposes to plant 4,572 trees, including species such as Kanchnar, Neem, Mango, and Badam. For air quality management during construction, four anti-smog guns and 10-metre high barricading will be used. The environmental management cost is estimated at ₹82 lakh for the construction phase and a capital expenditure of ₹7.57 crore for the operation phase.
Balkrishna Industry Township site plan and layout
3 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
76 applications in Kachchh since January 2022 are in the same category (Buildings & townships): 25 approved, 36 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 90.4 acres, this one is larger than 81% of them.
66 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Padhar, Bhuj, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest land to construct of approach road in favour of BKT TYRES… — forest land use approved, 450 m away
- Construction of Approach Road and Laying of Underground Pipeculverter — forest land use approved, 600 m away
- 2 Approach Road for Survey No. 365 of Village: Paddhar, Ta: Bhuj, Dist: Kutch… — forest land use approved, 750 m away
- Expansion of Carbon Black Manufacturing Facility from 1.65 LTPA to 1.926 LTPA… — environmental approval granted, 1 km away
- Diversion of 0.0036 HA. of PF land for Bholenath CNG & Venus Pipe Industry… — more information requested, 1.2 km away
- Expansion of Carbon Black Manufacturing Facility (from 1.92 LTPA to 8 LTPA),… — returned to applicant, 1.3 km away
- Diversion of 0.0580 Ha Forest land to construct of approach road in favor of… — in-principle approval, conditions pending, 1.4 km away
- "EC Application under Para 7(ii) for Carbon Black Manufacturing Facility (from… — returned to applicant, 1.4 km away
More from Balkrishna Industries Limited in Kachchh
- Expansion of Carbon Black Manufacturing Facility (6.6 LTPA to 8.0 LTPA) with… — returned to applicant
- "EC Application under Para 7(ii) for Carbon Black Manufacturing Facility (from… — environmental approval granted
- "EC Application under Para 7(ii) for Carbon Black Manufacturing Facility (from… — returned to applicant
- "EC Application under Para 7(ii) for Carbon Black Manufacturing Facility (from… — returned to applicant
- Expansion of Carbon Black Manufacturing Facility (from 1.92 LTPA to 8 LTPA),… — withdrawn
- Approach Roads for Survery No. 741/13 and Survey No. 457 of Village: Paddhar,… — forest land use approved
All 13 Balkrishna Industries projects across India