Quick answers
What is this project?
Diversion of Forest land to construct of approach road in favour of BKT TYRES LIMITED, Village: Paddhar, Ta: Bhuj, Dist: Kutch is an approved road project in Padhar, Bhuj, Kachchh, Gujarat. The site covers 0.1 acres.
Who is building it?
The applicant is Bkt Tyres Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 15 Jul 2024), as of 27 Nov 2026.
Where is it?
In Padhar, Bhuj, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹3 lakh; a site of 0.1 acres and 380 m² of forest land.
When was it filed?
The application was filed on 26 Apr 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 15 Jul 2024 |
| Application filed | 26 Apr 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Bkt Tyres Limited |
| Land area | 400 m² |
| Forest land | 380 m² |
| Project cost | ₹3 lakh |
| Village / locality | Padhar |
| Taluk / tehsil | Bhuj |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12038 |
In context
76 applications in Kachchh since January 2022 are in the same category (Roads & highways): 23 approved, 32 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.1 acres, this one is smaller than 87% of them.
66 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Padhar, Bhuj, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Balkrishna Industry Township — environmental approval granted, 450 m away
- Expansion of Carbon Black Manufacturing Facility from 1.65 LTPA to 1.926 LTPA… — environmental approval granted, 600 m away
- Construction of Approach Road and Laying of Underground Pipeculverter — forest land use approved, 700 m away
- 2 Approach Road for Survey No. 365 of Village: Paddhar, Ta: Bhuj, Dist: Kutch… — forest land use approved, 850 m away
- Expansion of Carbon Black Manufacturing Facility (from 1.92 LTPA to 8 LTPA),… — returned to applicant, 950 m away
- "EC Application under Para 7(ii) for Carbon Black Manufacturing Facility (from… — returned to applicant, 1 km away
- Expansion of Carbon Black Manufacturing Facility (from 1.92 LTPA to 8 LTPA),… — withdrawn, 1 km away
- Expansion of Carbon Black Manufacturing Facility (from 1.92 LTPA to 8 LTPA),… — environmental approval granted, 1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.