Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 24 Oct 2025 |
| Application filed | 16 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Renew Photovoltaics Private Limited |
| Use | Industrial |
| Towers | 4 |
| Height | 18 m |
| Parking spaces | 820 |
| Land area | 102 acres (41.3 ha) |
| Built-up area | 1,49,118 m² (16,05,091 sq ft) |
| Plot area | 1,49,118 m² (16,05,091 sq ft) |
| Project cost | ₹2,265.7 crore |
| Village / locality | Dholera |
| Taluk / tehsil | Dholera |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-07747 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 6 Oct 2026 | Initial checks | 19.6 acres | ₹2,265.7 crore |
| New project filed 16 Jul 2025 (this page) | Environmental approval granted | 102 acres | ₹2,265.7 crore |
In context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 102 acres, this one is larger than 95% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dholera, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Blueparrot Data Centre: 813 MW Data Centre Building Project in Dholera, Gujarat (2.3 km away).
Other projects nearby
- Environment Clearance for proposed Factory Building construction project for… — initial checks, 200 m away
- Expansion of Semiconductor Wafer Fabrication Project — under environmental review, 600 m away
- Semiconductor Wafer Fabrication — environmental approval granted, 650 m away
- Semiconductor Wafer Fabrication — environmental approval granted, 650 m away
- Shantiban Skylar — initial checks, 1.1 km away
- Proposed Residential & Commercial Building Project namely "Akhilam" by Parjiya… — environmental approval granted, 1.4 km away
- Data Centre Building project by Blueparrot Pedestal Limited — under environmental review, 2.3 km away
- Dholera Iconic — environmental approval granted, 2.8 km away
All 3 Renew Photovoltaics projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.