Quick answers
What is this project?
2 Approach Road for Survey No. 365 of Village: Paddhar, Ta: Bhuj, Dist: Kutch Through the Roadside Protected Forest Land of Bhuj Bhachau Road is an approved road project in Padhar, Bhuj, Kachchh, Gujarat. The site covers 0.1 acres.
Who is building it?
The applicant is Patel Kaushikbhai Hareshbhai.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 7 Jul 2025), as of 27 Nov 2026.
Where is it?
In Padhar, Bhuj, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹10 lakh; a site of 0.1 acres and 490 m² of forest land.
When was it filed?
The application was filed on 27 May 2025.
Project details
| Official title | Construction of 2 Approach Road for Survey No. 365 of Village: Paddhar, Ta: Bhuj, Dist: Kutch Through the Roadside Protected Forest Land of Bhuj Bhachau Road |
|---|---|
| Status | Forest land use approved |
| Status since | 7 Jul 2025 |
| Application filed | 27 May 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Patel Kaushikbhai Hareshbhai |
| Land area | 500 m² |
| Forest land | 490 m² |
| Project cost | ₹10 lakh |
| Village / locality | Padhar |
| Taluk / tehsil | Bhuj |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12166 |
In context
76 applications in Kachchh since January 2022 are in the same category (Roads & highways): 23 approved, 32 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.1 acres, this one is smaller than 79% of them.
57 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Padhar, Bhuj, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction of Approach Road and Laying of Underground Pipeculverter — forest land use approved, 200 m away
- Diversion of 0.0036 HA. of PF land for Bholenath CNG & Venus Pipe Industry… — more information requested, 600 m away
- Diversion of 0.0580 Ha Forest land to construct of approach road in favor of… — in-principle approval, conditions pending, 650 m away
- Balkrishna Industry Township — environmental approval granted, 750 m away
- Approach Road and Laying of Underground Pipeculverter Through Roadside… — lapsed, 750 m away
- Diversion of Forest land to construct of approach road in favour of BKT TYRES… — forest land use approved, 850 m away
- Expansion of Carbon Black Manufacturing Facility from 1.65 LTPA to 1.926 LTPA… — environmental approval granted, 1.3 km away
- Expansion of Carbon Black Manufacturing Facility (from 1.92 LTPA to 8 LTPA),… — returned to applicant, 1.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.