Quick answers
What is this project?
Approach Road and Laying of Underground Pipeculverter Through Roadside Protected Forest Land of Bhuj Bhachau Road is a lapsed road project in Padhar, Bhuj, Kachchh, Gujarat. The site covers 0.2 acres.
Who is building it?
The applicant is Suzlon Energy Limited.
Has it been approved?
No. The application was lapsed on 15 May 2026, so it is no longer under consideration.
Where is it?
In Padhar, Bhuj, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹10 lakh; a site of 0.2 acres and 850 m² of forest land.
When was it filed?
The application was filed on 27 Mar 2026.
Project details
| Official title | Construction of Approach Road and Laying of Underground Pipeculverter Through Roadside Protected Forest Land of Bhuj Bhachau Road. |
|---|---|
| Status | Lapsed |
| Status since | 15 May 2026 |
| Application filed | 27 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Suzlon Energy Limited |
| Land area | 900 m² |
| Forest land | 850 m² |
| Project cost | ₹10 lakh |
| Village / locality | Padhar |
| Taluk / tehsil | Bhuj |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13433 |
In context
76 applications in Kachchh since January 2022 are in the same category (Roads & highways): 23 approved, 32 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.2 acres, this one is smaller than 61% of them.
52 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Padhar, Bhuj, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.0580 Ha Forest land to construct of approach road in favor of… — in-principle approval, conditions pending, 100 m away
- Diversion of 0.0036 HA. of PF land for Bholenath CNG & Venus Pipe Industry… — more information requested, 450 m away
- 2 Approach Road for Survey No. 365 of Village: Paddhar, Ta: Bhuj, Dist: Kutch… — forest land use approved, 750 m away
- Construction of Approach Road and Laying of Underground Pipeculverter — forest land use approved, 950 m away
- Balkrishna Industry Township — environmental approval granted, 1.5 km away
- Diversion of Forest land to construct of approach road in favour of BKT TYRES… — forest land use approved, 1.6 km away
- Expansion of Carbon Black Manufacturing Facility from 1.65 LTPA to 1.926 LTPA… — environmental approval granted, 2 km away
- Expansion of Carbon Black Manufacturing Facility (from 1.92 LTPA to 8 LTPA),… — returned to applicant, 2.4 km away
More from Suzlon Energy Limited in Kachchh
- Diversion of 0.0580 Ha Forest land to construct of approach road in favor of… — in-principle approval, conditions pending
All 13 Suzlon Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.