Quick answers
What is this project?
Erection Work of 66KV Tower Line From 66KV Uchchhal Substation to Proposed 66KV Kukarmunda Pumping Station is a lapsed power project in Vadpada (Nesu), Uchchhal, Tapi, Gujarat. The site covers 259.2 acres.
Who is building it?
The applicant is Gujarat Energy Transmission Corp LTD.
Has it been approved?
No. The application was lapsed on 1 Oct 2026, so it is no longer under consideration.
Where is it?
In Vadpada (Nesu), Uchchhal, Tapi, Gujarat.
How big is it?
It has a stated cost of ₹10.5 crore; a site of 259.2 acres and 50.9 acres (20.6 ha) of forest land.
When was it filed?
The application was filed on 15 Jan 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 1 Oct 2026 |
| Application filed | 15 Jan 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Gujarat Energy Transmission Corp LTD |
| Land area | 259.2 acres (104.9 ha) |
| Forest land | 50.9 acres (20.6 ha) |
| Project cost | ₹10.5 crore |
| Village / locality | Vadpada (Nesu) |
| Taluk / tehsil | Uchchhal |
| District | Tapi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12439 |
In context
11 applications in Tapi since January 2022 are in the same category (Power): 2 approved, 2 filed or under review, and 7 withdrawn, lapsed or rejected.
Where it is
Vadpada (Nesu), Uchchhal, Tapi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposal to grant permission for laying Optical Fiber Cable in Uchchhal, Nizar… — lapsed, 5.8 km away
- Divrsion of Protected Forest Land for laying of OFC Cable from Uchchhal Nizar… — lapsed, 13.6 km away
- Diversion of Forest Land of 2.8392 Hac for forest clearance for Supply,… — initial checks, 17 km away
- Proposal to grant permission for laying Optical Fiber Cable along the road in… — under forest review, 20 km away
- Amalpada Pumped Storage Hydro Electric Project (300 MW) — cleared for impact study, 20.9 km away
- 0.01858 ha Reserved forest land for the project of Construction New SBI Branch… — not approved, 23.6 km away
- 0.1858 ha Reserved forest land for the project of Construction of New SBI… — lapsed, 23.7 km away
- Widening and Strengthening Of Boarda-Satkashi-Sherulla (Km. 0/000 To 29/500).… — lapsed, 23.7 km away
More from Gujarat Energy Transmission Corp LTD in Tapi
- Laying of 66kV 630 sq mm (3+1) XLPE Underground cable for 66KV Ukai - Satkashi… — forest land use approved
- Laying of 66kV 630 sq mm (3+1) XLPE Underground cable for 66KV Uchchhal –… — forest land use approved
- Line erection work of 66KV Ukai SS to 66kV Satkashi pumping station-1,2 & 3 of… — lapsed
- Erection work of 66KV Panther Tower Line from exist 66KV Karanjkhed Substation… — approval revoked
- Laying of 66kV 630 sq mm (3+1) XLPE Underground cable for 66KV Ukai - Bhimpura… — forest land use approved
6 Gujarat Energy Transmission Corp projects in Tapi
All 231 Gujarat Energy Transmission Corp projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.