Quick answers
What is this project?
Diversion of Forest Land of 2.8392 Hac for forest clearance for Supply, Erection, Testing & Commissioning of LILO of one circuit of 220kv Ukai (Hydro) – Achhaliya line at 220kv Sarvala S/s 88.683 km on D/C & M/C tower with AL-59 conductor (61/3.50) and OPGW cable is a proposed power project in Vanka, Nizar, Tapi, Gujarat. It seeks 7 acres of forest land.
Who is building it?
The applicant is Getco Bharuch.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Vanka, Nizar, Tapi, Gujarat.
How big is it?
It has 7 acres (2.8 ha) of forest land.
When was it filed?
The application was filed on 7 Oct 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 7 Oct 2026 |
| Application filed | 7 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Getco Bharuch |
| Forest land | 7 acres (2.8 ha) |
| Village / locality | Vanka |
| Taluk / tehsil | Nizar |
| District | Tapi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13024 |
In context
11 applications in Tapi since January 2022 are in the same category (Power): 2 approved, 2 filed or under review, and 7 withdrawn, lapsed or rejected.
Where it is
Vanka, Nizar, Tapi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Erection Work of 66KV Tower Line From 66KV Uchchhal Substation to Proposed… — lapsed, 17 km away
- Proposal to grant permission for laying Optical Fiber Cable in Uchchhal, Nizar… — lapsed, 18.8 km away
- Amalpada Pumped Storage Hydro Electric Project (300 MW) — cleared for impact study, 21 km away
- Divrsion of Protected Forest Land for laying of OFC Cable from Uchchhal Nizar… — lapsed, 24.4 km away
- 0.01858 ha Reserved forest land for the project of Construction New SBI Branch… — not approved, 25 km away
- 0.1858 ha Reserved forest land for the project of Construction of New SBI… — lapsed, 25.1 km away
- Widening and Strengthening Of Boarda-Satkashi-Sherulla (Km. 0/000 To 29/500).… — lapsed, 25.6 km away
- Widening and Strengthening Of Boarda-Satkashi-Sherulla (Km. 0/000 To 29/500).… — more information requested, 25.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.