Quick answers
What is this project?
Diversion of Forest Land for the Construction Over Head Transmission Line is a proposed power project in Kapurasi, Lakhpat, Kachchh, Gujarat. The site covers 16.2 acres.
Who is building it?
The applicant is Gujarat Energy Transmission Corp LTD.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kapurasi, Lakhpat, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹15 crore; a site of 16.2 acres and 16.2 acres (6.5 ha) of forest land.
When was it filed?
The application was filed on 7 Mar 2023.
Project details
| Status | More information requested |
|---|---|
| Status since | 1 Aug 2026 |
| Application filed | 7 Mar 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Gujarat Energy Transmission Corp LTD |
| Land area | 16.2 acres (6.5 ha) |
| Forest land | 16.2 acres (6.5 ha) |
| Project cost | ₹15 crore |
| Village / locality | Kapurasi |
| Taluk / tehsil | Lakhpat |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13331 |
In context
75 applications in Kachchh since January 2022 are in the same category (Power): 30 approved, 30 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 16.2 acres, this one is smaller than 54% of them.
22 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kapurasi, Lakhpat, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Limestone Mine "Mudhvay Sub Block A" (Area: 198.90.98 ha) with… — environmental approval granted, 2.7 km away
- Proposed Limestone Mine "Mudhvay Sub Block A" (Area: 198.90.98 ha) with… — cleared for impact study, 2.7 km away
- Transfer of ToR/Change in Name subsequent to NCLT Order from Adani Cementation… — cleared for impact study, 3.4 km away
- Captive Jetty, Desalination Plant With Intake and Outfall and Related… — under coastal review, 3.4 km away
- Captive Jetty, Desalination Plant with Intake and Outfall and Related… — cleared for impact study, 3.4 km away
- Transfer of EC/Change in Name subsequent to NCLT Order from Adani Cementation… — more information requested, 3.4 km away
- Mudhvay Sub-Block 'B' Limestone Mine with Limestone production capacity of… — environmental approval granted, 3.4 km away
- Diversion of 3.1437 ha of Forest land for the proposed Conveyor Belt Corridor… — lapsed, 3.8 km away
More from Gujarat Energy Transmission Corp LTD in Kachchh
- Clearance of land In Wild Ass Sanctuary (Raising/Shifting of Existing 220 KV… — under wildlife review
- 66 kV S/C Transmission Line from 66 kV Rapar Substation to 66 kV Balasar… — more information requested
- Permission for Diversion of 0.1001 Ha Forest land of Karmata Village, Ta:… — more information requested
- Diversion of forest area of Vira Village, Ta: Anjar, Dist: Kutch for… — more information requested
- Diversion of 13.11 Ha Reserve forest land for 400kV D/C Bhachunda - Varsana… — under forest review
- Permission for Diversion of 0.4106 Ha Roadside Protected Forest land of… — more information requested
43 Gujarat Energy Transmission Corp projects in Kachchh
All 231 Gujarat Energy Transmission Corp projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.