Project details
| Status | Lapsed |
|---|---|
| Status since | 20 Mar 2025 |
| Application filed | 18 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Kpi Green Energy Limited |
| Land area | 400 m² |
| Forest land | 360 m² |
| Project cost | ₹9 lakh |
| Village / locality | Vagra |
| Taluk / tehsil | Vagra |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13969 |
In context
51 applications in Bharuch since January 2022 are in the same category (Power): 31 approved, 10 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 0.1 acres, this one is smaller than 97% of them.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vagra, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to ONGC Plans 78 Oil and Gas Wells in Bharuch, Gujarat (8.1 km away).
Other projects nearby
- Industrial project by Applied Chemicals Private Limited — cleared for impact study, 800 m away
- Industrial project by M/s. Merino Industries Limited — cleared for impact study, 800 m away
- Proposed Project for Dyes & Dye Intermediates manufacturing by M/s. Fumo Chem… — cleared for impact study, 800 m away
- FCA Proposal Solar power project - laying 33 KV 6 Conductors overhead… — more information requested, 1.2 km away
- To Set Up Solar Park and Supply Power to Getco by Laying Transmission Line for… — forest land use approved, 2.2 km away
- Building project by M/s. Bharuch Enviro Infrastructure Ltd. — environmental approval granted, 3.8 km away
- Proposed New project of Synthetic Organic Chemicals manufacturing by M/s.… — under environmental review, 4 km away
- Proposed New project of Synthetic Organic Chemicals manufacturing by M/s.… — cleared for impact study, 4 km away
More from Kpi Green Energy Limited in Bharuch
- Solar Park - Diversion Area 0.0030 Ha. Laying 33KV 4-Nos electric cable line… — more information requested
- FCA proposal - Diversion of Protected Forest Area 0.0956 Ha solar power… — in-principle approval, conditions pending
- Fca Proposal Permission for Diversion of Protected Forest Bare Minimum Area… — forest land use approved
- Request Protected Forest permission for area 0.0028 Ha. KPI Solar Park… — forest land use approved
- Diversion of Protected Forest area 0.2764 Ha Laying transmission power line… — forest land use approved
- Diversion of Forest Area – 0.0840 Ha. Permission for laying 33 KV 5-nos.… — forest land use approved
26 Kpi Green Energy projects in Bharuch
All 37 Kpi Green Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.