What is Developing? Open the mapMap

Forest land use approvedPower · Bharuch, Gujarat

Diversion of Forest land 0.9345 Ha. - Solar Power Project -Muler-Gandhar-KPI ORA Sub-Station Connectivity for 30 MW – Permission for laying 33KV – 7 conductors by installing H-type HDG pole Overhead connectivity on route from KPI Muler-Gandhar-KPI ORA Sub-Station, Vagra Taluka, Bharuch District

Diversion of Forest land 0.9345 Ha. - Solar Power Project -Muler-Gandhar-KPI ORA Sub-Station Connectivity for 30 MW – Permission for laying 33KV – 7 conductors by installing H-type HDG pole Overhead connectivity on route from KPI Muler-Gandhar-KPI ORA Sub-Station, Vagra Taluka, Bharuch District is an approved power project in Vagra, Bharuch, Gujarat. The site covers 2.3 acres. Its stated project cost is ₹50 lakh. As of 27 Nov 2026, its status is “Forest land use approved” (since 27 May 2024).

See it on the live map All projects in Bharuch

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusForest land use approved
Status since27 May 2024
Application filed28 Jan 2024
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantKpi Green Energy Limited
Land area2.3 acres (0.9 ha)
Forest land2.3 acres (0.9 ha)
Project cost₹50 lakh
Village / localityVagra
Taluk / tehsilVagra
DistrictBharuch
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-14113

In context

51 applications in Bharuch since January 2022 are in the same category (Power): 31 approved, 10 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.3 acres, this one is larger than 73% of them.

8 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Vagra, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to ONGC Plans 78 Oil and Gas Wells in Bharuch, Gujarat (4.7 km away).

Other projects nearby

More from Kpi Green Energy Limited in Bharuch

26 Kpi Green Energy projects in Bharuch
All 37 Kpi Green Energy projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.