Quick answers
What is this project?
Submission Proposal for Diversion of Forest Land of 0.0217 Hectare for forest clearance for Laying of U/g cable laying work from 66KV Saronda SS to Proposed 66KV Kalgam sub-station is a lapsed power project in Seronda, Umbergaon, Valsad, Gujarat. The site covers 0 acres.
Who is building it?
The applicant is Gujarat Energy Transmission Corp LTD.
Has it been approved?
No. The application was lapsed on 16 Nov 2026, so it is no longer under consideration.
Where is it?
In Seronda, Umbergaon, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹18.3 crore; a site of 0 acres and 220 m² of forest land.
When was it filed?
The application was filed on 13 Oct 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 16 Nov 2026 |
| Application filed | 13 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Gujarat Energy Transmission Corp LTD |
| Land area | 200 m² |
| Forest land | 220 m² |
| Project cost | ₹18.3 crore |
| Village / locality | Seronda |
| Taluk / tehsil | Umbergaon |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13528 |
In context
16 applications in Valsad since January 2022 are in the same category (Power): 9 approved, 3 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 13 months from filing to approval. At 0 acres, this one is smaller than 92% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Seronda, Umbergaon, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Man-Made Fiber Manufacturing Industrial Unit by M/s Preeyarika Innovations… — cleared for impact study, 3.3 km away
- (1) 160/125/90 mm PE Gas Pipeline For Sarigam HDFC Bank to Sarigam Teen Rasta,… — forest land use approved, 4.5 km away
- Submission of 1.04916 Hac. Forest Land Proposal for Diversion for Social… — lapsed, 4.8 km away
- Providing Coastal Protection Work — recommended by coastal authority, 5.3 km away
- PROVIDING COASTAL PROTECTION WORK — recommended by coastal authority, 5.5 km away
- 160/125/90 mm PE Gas Pipeline Connectivity from Sarigam to Sarai village Ta:… — forest land use approved, 5.5 km away
- Up-Gradation of Fish Landing Centre at Umargam, District Valsad, Gujarat — coastal clearance granted, 5.9 km away
- PROVIDING COSTAL PROTECTION WORK — recommended by coastal authority, 6.1 km away
More from Gujarat Energy Transmission Corp LTD in Valsad
- Submission of 0.3521 Forest Land (Protected) Proposal for Diversion for Social… — under forest review
- Diversion of 19.3778 Ha Reserved Forest Land for construction of 66KV… — under forest review
- Diversion of 3.6709 Ha. Of Reserved Forest Land for construction of 66KV… — lapsed
- Diversion of 8.4109 Ha. Of Reserved Forest Land for construction of 66 KV… — more information requested
- Submission of 0.8848 Hac. Forest land proposal for Diversion for Social Forest… — forest land use approved
- Diversion of Forest Land of 0.0116 Hectare for forest clearance by Laying of… — forest land use approved
12 Gujarat Energy Transmission Corp projects in Valsad
All 231 Gujarat Energy Transmission Corp projects across India
About this information