Quick answers
What is this project?
Diversion of 0.847-hectare forest land for Erection of 220 KV Over Head line 220 kV Motigop- Babarzar line near Village Bhangor, Tal. Lalpur Dist. Jamnagar is a lapsed power project in Babarzar, Lalpur, Jamnagar, Gujarat. The site covers 868.8 acres.
Who is building it?
The applicant is Gujarat Energy Transmission Corp LTD.
Has it been approved?
No. The application was lapsed on 1 Aug 2026, so it is no longer under consideration.
Where is it?
In Babarzar, Lalpur, Jamnagar, Gujarat.
How big is it?
It has a stated cost of ₹65 crore; a site of 868.8 acres and 2.1 acres (0.8 ha) of forest land.
When was it filed?
The application was filed on 16 Jan 2025.
Project details
| Official title | Proposal for Diversion of 0.847-hectare forest land for Erection of 220 KV Over Head line 220 kV Motigop- Babarzar line near Village Bhangor, Tal. Lalpur Dist. Jamnagar. |
|---|---|
| Status | Lapsed |
| Status since | 1 Aug 2026 |
| Application filed | 16 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Gujarat Energy Transmission Corp LTD |
| Land area | 868.8 acres (351.6 ha) |
| Forest land | 2.1 acres (0.8 ha) |
| Project cost | ₹65 crore |
| Village / locality | Babarzar |
| Taluk / tehsil | Lalpur |
| District | Jamnagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14189 |
In context
30 applications in Jamnagar since January 2022 are in the same category (Power): 9 approved, 10 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 868.8 acres, this one is larger than 93% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Babarzar, Lalpur, Jamnagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.9267-hectare forest land for Erection of 220 KV Over Head line… — forest land use approved, 950 m away
- Diversion of 0.9267-hectare forest land for Erection of 220 KV Over Head line… — lapsed, 950 m away
- Gop-1 Limestone Mine over Mine lease area of 218.53 ha (Govt. Waste land) for… — environmental approval granted, 9.4 km away
- Diversion of Reserve Forest Land for construction of Govana to Apiya Road… — initial checks, 11.4 km away
- Ghunda Tebhda road 2.1539 ha. — lapsed, 12.1 km away
- Diversion of 0.72750 Ha of Reserved Forest Land for Wind Turbine Blade Air… — under forest review, 13.4 km away
- Tebhada Forest Crossing — lapsed, 13.6 km away
- Diversion of 0.147 Hectares of Reserve Forest Land for Laying a Water Pipeline… — lapsed, 15.1 km away
More from Gujarat Energy Transmission Corp LTD in Jamnagar
- Diversion of 0.15156 ha Reserved Forest land for Laying of 66kV Underground… — initial checks
- diversion of 0.1739-hectare forest land for Laying of 66KV S/C Rampar-Stena… — more information requested
- Diversion of 1.3573 ha forest land for erection of 66kV LILO Gorakhadi Line… — more information requested
- Diversion of 0.8676 ha forest land for 66kV LILO Gorakhadi line from 66kV… — lapsed
- 66KV S/C Line From 66KV Jayva (Getco) S/S to Switchyard of M/S Aluwerk LLP… — forest land use approved
- 66KV S/C line from 66KV Jayva(GETCO) Substation to switchyard of M/S RAVI… — forest land use approved
17 Gujarat Energy Transmission Corp projects in Jamnagar
All 231 Gujarat Energy Transmission Corp projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.