Quick answers
What is Juni Bavli Pumped Storage Hydro Electric Project (450 MW)?
Juni Bavli Pumped Storage Hydro Electric Project (450 MW) is a proposed water and irrigation project in Vajpur, Songadh, Tapi, Gujarat.
Who is building it?
The applicant is Gujarat State Electricity Corporation Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 30 Sept 2024), as of 27 Nov 2026.
Where is it?
In Vajpur, Songadh, Tapi, Gujarat.
How big is it?
It has a stated cost of ₹1,979.9 crore.
When was it filed?
The application was filed on 3 Aug 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 30 Sept 2024 |
| Application filed | 3 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | Gujarat State Electricity Corporation Limited |
| Project cost | ₹1,979.9 crore |
| Village / locality | Vajpur |
| Taluk / tehsil | Songadh |
| District | Tapi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-06046 |
In context
9 applications in Tapi since January 2022 are in the same category (Water & irrigation): 6 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vajpur, Songadh, Tapi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Juni Kayaliwel Pumped Storage Hydro Electric Project (300 MW) — lapsed, 2 km away
- Juni Kayaliwel Pumped Storage Hydro Electric Project (300 MW) — lapsed, 2 km away
- Laying OFC for 4G coverage of uncovered villages through USOF, Babarghat T… — lapsed, 2.2 km away
- Juni Kayaliwel Pumped Storage Hydro Electric Project (300 MW) — cleared for impact study, 2.4 km away
- Line erection work of 66KV Ukai SS to 66kV Satkashi pumping station-1,2 & 3 of… — lapsed, 2.6 km away
- Tapi 4G Sat USOF — forest land use approved, 4.3 km away
- Tapi 4G Sat USO — lapsed, 4.3 km away
- Permission for Drilling of Boreholes in Trapty Range, Vyara Forest Division,… — lapsed, 5.2 km away
More from Gujarat State Electricity Corporation Limited in Tapi
- Serula Pumped Storage Hydro Electric Project (960 MW) — more information requested
- Juni Kayaliwel Pumped Storage Hydro Electric Project (300 MW) — lapsed
- Satkashi Pumped Storage Hydro Electric Project (330 MW) — lapsed
- Serula Pumped Storage Hydro Electric Project (960 MW) — lapsed
- Serula Pumped Storage Hydro Electric Project (960 MW) — lapsed
- Juni Kayaliwel Pumped Storage Hydro Electric Project (300 MW) — lapsed
11 Gujarat State Electricity Corporation projects in Tapi
All 25 Gujarat State Electricity Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.