What is Developing? Open the mapMap

Under wildlife reviewPower · Kachchh, Gujarat

Diversion of 46.6 ha of Kutch Desert Wildlife Sanctuary land for Proposed of 66 KV S/C Line from existing 66 KV ambrapar SS to Proposed 66 KV Dholavira (Kharod) SS on D/C Panther tower with ACSR Dog Conductor

Diversion of 46.6 ha of Kutch Desert Wildlife Sanctuary land for Proposed of 66 KV S/C Line from existing 66 KV ambrapar SS to Proposed 66 KV Dholavira (Kharod) SS on D/C Panther tower with ACSR Dog Conductor is a proposed power project in Amarapar, Bhachau, Kachchh, Gujarat. The site covers 115.2 acres. Its stated project cost is ₹15 crore. As of 27 Nov 2026, its status is “Under wildlife review” (since 8 Dec 2023).

See it on the live map All projects in Kachchh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of 46.6 ha of Kutch Desert Wildlife Sanctuary land for Proposed of 66 KV S/C Line from existing 66 KV ambrapar SS to Proposed 66 KV Dholavira (Kharod) SS on D/C Panther tower with ACSR Dog Conductor is a proposed power project in Amarapar, Bhachau, Kachchh, Gujarat. The site covers 115.2 acres.

Who is building it?

The applicant is Gujarat Energy Transmission Corp LTD.

Has it been approved?

Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.

Where is it?

In Amarapar, Bhachau, Kachchh, Gujarat.

How big is it?

It has a stated cost of ₹15 crore and a site of 115.2 acres.

When was it filed?

The application was filed on 8 Dec 2023.

Project details

StatusUnder wildlife review
Status since8 Dec 2023
Application filed8 Dec 2023
Approval soughtWildlife review
Application typeNew project
SectorPower
ApplicantGujarat Energy Transmission Corp LTD
Land area115.2 acres (46.6 ha)
Project cost₹15 crore
Village / localityAmarapar
Taluk / tehsilBhachau
DistrictKachchh
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-14520

In context

75 applications in Kachchh since January 2022 are in the same category (Power): 30 approved, 30 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 115.2 acres, this one is larger than 75% of them.

Where it is

Amarapar, Bhachau, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Gujarat Energy Transmission Corp LTD in Kachchh

43 Gujarat Energy Transmission Corp projects in Kachchh
All 231 Gujarat Energy Transmission Corp projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.