Quick answers
What is this project?
Exapansion of steel plant –Sponge Iron through DRI Klins from 99,000 TPA to 4,05,375 TPA, WHRB Based Power generation from 5.0 MW to 29 MW, New AFBC Power Plant of 8.0 MW Capacity, MS Billets/ Hot Billets through Induction Funace from 48,000 TPA to 1,58,400 TPA, Rolled products through New Rolling Mill of 1,65,000 TPA, & New Slag Crusher of 120 TPD is an approved industrial project in Marar, Ramgarh, Jharkhand. The site covers 19 acres.
Who is building it?
The applicant is Bihar Foundry and Castings Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 18 Apr 2026), as of 27 Nov 2026.
Where is it?
In Marar, Ramgarh, Jharkhand.
How big is it?
It has a stated cost of ₹3.7 crore and a site of 19 acres.
When was it filed?
The application was filed on 1 Jul 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 18 Apr 2026 |
| Application filed | 1 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Bihar Foundry and Castings Limited |
| Land area | 19 acres (7.7 ha) |
| Project cost | ₹3.7 crore |
| Village / locality | Marar |
| Taluk / tehsil | Ramgarh |
| District | Ramgarh |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00199 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 23 Nov 2023 | Cleared for impact study | 19 acres | ₹3.7 crore |
| Expansion filed 1 Jul 2023 (this page) | Environmental approval granted | 19 acres | ₹3.7 crore |
In context
30 applications in Ramgarh since January 2022 are in the same category (Industry): 12 approved, 10 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 31 days from filing to approval. At 19 acres, this one is smaller than 60% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Marar, Ramgarh, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Exapansion of steel plant –Sponge Iron through DRI Klins from 99,000 TPA to… — cleared for impact study, 0 m away
- Modification-cum-Expansion of Ferro Alloy Plant (under violation) Modification… — under environmental review, 350 m away
- Industrial project by Bihar Foundry and Castings Limited — under environmental review, 350 m away
- Industrial project by Bihar Foundry and Castings Limited — cleared for impact study, 350 m away
- Bihar foundry & Castings ltd. Water Pipe line from Damodar river — in-principle approval, conditions pending, 650 m away
- Forest Diversion of 3.94 hectare of land for M/s Bihar Foundry & Castings… — under forest review, 700 m away
- Underground 33 KV transmission line from existing location no. 19 of Giddi… — forest land use approved, 1.2 km away
- BFCL - Water Pipe Line From Damodar River — lapsed, 1.4 km away
More from Bihar Foundry and Castings Limited in Ramgarh
- Forest Diversion of 3.94 hectare of land for M/s Bihar Foundry & Castings… — under forest review
- Bihar foundry & Castings ltd. Water Pipe line from Damodar river — in-principle approval, conditions pending
- Modification-cum-Expansion of Ferro Alloy Plant (under violation) Modification… — under environmental review
- BFCL - Water Pipe Line From Damodar River — lapsed
- Industrial project by Bihar Foundry and Castings Limited — under environmental review
- Industrial project by Bihar Foundry and Castings Limited — cleared for impact study
All 8 Bihar Foundry and Castings projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.