Environmental approval grantedIndustry · Ramgarh, Jharkhand

Exapansion of steel plant –Sponge Iron through DRI Klins from 99,000 TPA to 4,05,375 TPA, WHRB Based Power generation from 5.0 MW to 29 MW, New AFBC Power Plant of 8.0 MW Capacity, MS Billets/ Hot Billets through Induction Funace from 48,000 TPA to 1,58,400 TPA, Rolled products through New Rolling Mill of 1,65,000 TPA, & New Slag Crusher of 120 TPD

Exapansion of steel plant –Sponge Iron through DRI Klins from 99,000 TPA to 4,05,375 TPA, WHRB Based Power generation from 5.0 MW to 29 MW, New AFBC Power Plant of 8.0 MW Capacity, MS Billets/ Hot Billets through Induction Funace from 48,000 TPA to 1,58,400 TPA, Rolled products through New Rolling Mill of 1,65,000 TPA, & New Slag Crusher of 120 TPD is an approved industrial project in Marar, Ramgarh, Jharkhand. The site covers 19 acres. Its stated project cost is ₹3.7 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 18 Apr 2026).

See it on the live map All projects in Ramgarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Exapansion of steel plant –Sponge Iron through DRI Klins from 99,000 TPA to 4,05,375 TPA, WHRB Based Power generation from 5.0 MW to 29 MW, New AFBC Power Plant of 8.0 MW Capacity, MS Billets/ Hot Billets through Induction Funace from 48,000 TPA to 1,58,400 TPA, Rolled products through New Rolling Mill of 1,65,000 TPA, & New Slag Crusher of 120 TPD is an approved industrial project in Marar, Ramgarh, Jharkhand. The site covers 19 acres.

Who is building it?

The applicant is Bihar Foundry and Castings Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 18 Apr 2026), as of 27 Nov 2026.

Where is it?

In Marar, Ramgarh, Jharkhand.

How big is it?

It has a stated cost of ₹3.7 crore and a site of 19 acres.

When was it filed?

The application was filed on 1 Jul 2023.

Project details

StatusEnvironmental approval granted
Status since18 Apr 2026
Application filed1 Jul 2023
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantBihar Foundry and Castings Limited
Land area19 acres (7.7 ha)
Project cost₹3.7 crore
Village / localityMarar
Taluk / tehsilRamgarh
DistrictRamgarh
StateJharkhand
Location fromSite boundary on record
Our referenceWID-JH-00199

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Early planning filed 23 Nov 2023Cleared for impact study19 acres₹3.7 crore
Expansion filed 1 Jul 2023 (this page)Environmental approval granted19 acres₹3.7 crore

In context

30 applications in Ramgarh since January 2022 are in the same category (Industry): 12 approved, 10 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 31 days from filing to approval. At 19 acres, this one is smaller than 60% of them.

21 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Marar, Ramgarh, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Bihar Foundry and Castings Limited in Ramgarh

All 8 Bihar Foundry and Castings projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.