Quick answers
What is BFCL - Water Pipe Line From Damodar River?
BFCL - Water Pipe Line From Damodar River is a lapsed pipeline project in Nalsora, Ramgarh, Jharkhand. It seeks 0.5 acres of forest land.
Who is building it?
The applicant is Bihar Foundry and Castings Limited.
Has it been approved?
No. The application was lapsed on 2 Sept 2025, so it is no longer under consideration.
Where is it?
In Nalsora, Ramgarh, Jharkhand.
How big is it?
It has a stated cost of ₹2.3 crore and 2,040 m² of forest land.
When was it filed?
The application was filed on 20 Jan 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 2 Sept 2025 |
| Application filed | 20 Jan 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Bihar Foundry and Castings Limited |
| Forest land | 2,040 m² |
| Project cost | ₹2.3 crore |
| Village / locality | Nalsora |
| Taluk / tehsil | Ramgarh |
| District | Ramgarh |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-02545 |
In context
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nalsora, Ramgarh, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bihar foundry & Castings ltd. Water Pipe line from Damodar river — in-principle approval, conditions pending, 800 m away
- Forest Diversion of 3.94 hectare of land for M/s Bihar Foundry & Castings… — under forest review, 1 km away
- Underground 33 KV transmission line from existing location no. 19 of Giddi… — forest land use approved, 1.1 km away
- Exapansion of steel plant –Sponge Iron through DRI Klins from 99,000 TPA to… — cleared for impact study, 1.4 km away
- Exapansion of steel plant –Sponge Iron through DRI Klins from 99,000 TPA to… — environmental approval granted, 1.4 km away
- Modification-cum-Expansion of Ferro Alloy Plant (under violation) Modification… — under environmental review, 1.7 km away
- Industrial project by Bihar Foundry and Castings Limited — under environmental review, 1.7 km away
- Industrial project by Bihar Foundry and Castings Limited — cleared for impact study, 1.7 km away
More from Bihar Foundry and Castings Limited in Ramgarh
- Forest Diversion of 3.94 hectare of land for M/s Bihar Foundry & Castings… — under forest review
- Bihar foundry & Castings ltd. Water Pipe line from Damodar river — in-principle approval, conditions pending
- Exapansion of steel plant –Sponge Iron through DRI Klins from 99,000 TPA to… — cleared for impact study
- Exapansion of steel plant –Sponge Iron through DRI Klins from 99,000 TPA to… — environmental approval granted
- Modification-cum-Expansion of Ferro Alloy Plant (under violation) Modification… — under environmental review
- Industrial project by Bihar Foundry and Castings Limited — under environmental review
All 8 Bihar Foundry and Castings projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.