Quick answers
What is this project?
Forest Diversion of 3.94 hectare of land for M/s Bihar Foundry & Castings Limited (BFCL),Ferro Alloy plant,Ramgarh is a proposed industrial project in Marar, Ramgarh, Jharkhand. The site covers 9.7 acres.
Who is building it?
The applicant is Bihar Foundry and Castings Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Marar, Ramgarh, Jharkhand.
How big is it?
It has a stated cost of ₹340 crore; a site of 9.7 acres and 9.7 acres (3.9 ha) of forest land.
When was it filed?
The application was filed on 1 Nov 2026.
Project details
| Status | Under forest review |
|---|---|
| Status since | 13 Nov 2026 |
| Application filed | 1 Nov 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Industry |
| Applicant | Bihar Foundry and Castings Limited |
| Land area | 9.7 acres (3.9 ha) |
| Forest land | 9.7 acres (3.9 ha) |
| Project cost | ₹340 crore |
| Village / locality | Marar |
| Taluk / tehsil | Ramgarh |
| District | Ramgarh |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-02302 |
In context
30 applications in Ramgarh since January 2022 are in the same category (Industry): 12 approved, 10 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 31 days from filing to approval. At 9.7 acres, this one is smaller than 77% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Marar, Ramgarh, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bihar foundry & Castings ltd. Water Pipe line from Damodar river — in-principle approval, conditions pending, 400 m away
- Underground 33 KV transmission line from existing location no. 19 of Giddi… — forest land use approved, 500 m away
- Exapansion of steel plant –Sponge Iron through DRI Klins from 99,000 TPA to… — cleared for impact study, 700 m away
- Exapansion of steel plant –Sponge Iron through DRI Klins from 99,000 TPA to… — environmental approval granted, 700 m away
- Modification-cum-Expansion of Ferro Alloy Plant (under violation) Modification… — under environmental review, 800 m away
- Industrial project by Bihar Foundry and Castings Limited — under environmental review, 800 m away
- Industrial project by Bihar Foundry and Castings Limited — cleared for impact study, 800 m away
- BFCL - Water Pipe Line From Damodar River — lapsed, 1 km away
More from Bihar Foundry and Castings Limited in Ramgarh
- Bihar foundry & Castings ltd. Water Pipe line from Damodar river — in-principle approval, conditions pending
- Exapansion of steel plant –Sponge Iron through DRI Klins from 99,000 TPA to… — cleared for impact study
- Exapansion of steel plant –Sponge Iron through DRI Klins from 99,000 TPA to… — environmental approval granted
- Modification-cum-Expansion of Ferro Alloy Plant (under violation) Modification… — under environmental review
- BFCL - Water Pipe Line From Damodar River — lapsed
- Industrial project by Bihar Foundry and Castings Limited — under environmental review
All 8 Bihar Foundry and Castings projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.