Bihar foundry & Castings ltd. Water Pipe line from Damodar river is a proposed pipeline project in Marar, Ramgarh, Jharkhand. The site covers 1.5 acres.
Who is building it?
The applicant is Bihar Foundry and Castings Limited.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Marar, Ramgarh, Jharkhand.
How big is it?
It has a stated cost of ₹2.7 crore; a site of 1.5 acres and 910 m² of forest land.
When was it filed?
The application was filed on 5 Dec 2023.
Project details
| Status | In-principle approval, conditions pending |
|---|---|
| Status since | 27 Apr 2026 |
| Application filed | 5 Dec 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Bihar Foundry and Castings Limited |
| Land area | 1.5 acres (0.6 ha) |
| Forest land | 910 m² |
| Project cost | ₹2.7 crore |
| Village / locality | Marar |
| Taluk / tehsil | Ramgarh |
| District | Ramgarh |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-02272 |
In context
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Marar, Ramgarh, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Forest Diversion of 3.94 hectare of land for M/s Bihar Foundry & Castings… — under forest review, 400 m away
- Exapansion of steel plant –Sponge Iron through DRI Klins from 99,000 TPA to… — cleared for impact study, 650 m away
- Exapansion of steel plant –Sponge Iron through DRI Klins from 99,000 TPA to… — environmental approval granted, 650 m away
- BFCL - Water Pipe Line From Damodar River — lapsed, 800 m away
- Modification-cum-Expansion of Ferro Alloy Plant (under violation) Modification… — under environmental review, 850 m away
- Industrial project by Bihar Foundry and Castings Limited — under environmental review, 850 m away
- Industrial project by Bihar Foundry and Castings Limited — cleared for impact study, 850 m away
- Underground 33 KV transmission line from existing location no. 19 of Giddi… — forest land use approved, 850 m away
More from Bihar Foundry and Castings Limited in Ramgarh
- Forest Diversion of 3.94 hectare of land for M/s Bihar Foundry & Castings… — under forest review
- Exapansion of steel plant –Sponge Iron through DRI Klins from 99,000 TPA to… — cleared for impact study
- Exapansion of steel plant –Sponge Iron through DRI Klins from 99,000 TPA to… — environmental approval granted
- Modification-cum-Expansion of Ferro Alloy Plant (under violation) Modification… — under environmental review
- BFCL - Water Pipe Line From Damodar River — lapsed
- Industrial project by Bihar Foundry and Castings Limited — under environmental review
All 8 Bihar Foundry and Castings projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.