One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Sponge iron plant production from 33,000TPA to 62700 TPA by enhancement of…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 19 Jun 2024 |
| Application filed | 15 May 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Niranjan Metalic Limited |
| Land area | 40 acres (16.2 ha) |
| Project cost | ₹36 lakh |
| Village / locality | Gadi |
| Taluk / tehsil | Giridih |
| District | Giridih |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00796 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 14 Dec 2024 | Environmental approval granted | 40 acres | ₹36 lakh |
| Early planning filed 15 May 2024 (this page) | Cleared for impact study | 40 acres | ₹36 lakh |
In context
29 applications in Giridih since January 2022 are in the same category (Industry): 20 approved, 4 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 39 days from filing to approval. At 40 acres, this one is larger than 69% of them.
26 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gadi, Giridih, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Sponge iron plant production from 33,000TPA to 62700 TPA by… — environmental approval granted, 0 m away
- Expansion of Sponge Iron Plant of M/s Atibir Industries Co. Ltd. by addition… — environmental approval granted, 700 m away
- Expansion of existing Rolling Mill form Production Capacity of TMT Bars –… — cleared for impact study, 750 m away
- Environmental Clearance for Expansion of Sponge Iron Plant from 33,000 TPA to… — environmental approval granted, 850 m away
- Environmental Clearance for Expansion of Sponge Iron Plant from 33,000 TPA to… — cleared for impact study, 850 m away
- Enhancement of Sponge Iron Production from 90,000 TPA to 99,000 TPA (by… — environmental approval granted, 1.2 km away
- Expansion of existing Sponge Iron Plant from 33,000TPA to 264,000TPA through… — under environmental review, 1.6 km away
- Expansion of existing Sponge Iron Plant from 33,000TPA to 264,000TPA through… — cleared for impact study, 1.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.