What is Developing? Open the mapMap

Initial checksIndustry · Bagalkote, Karnataka

Addition of Grain as a Raw Material in 600 KLPD Distillery based on B/C Heavy Molasses /Sugarcane Juice/Syrup without any enhancement in Distillery Production Capacity by TruAlt Bio Energy Ltd., Unit -2

Addition of Grain as a Raw Material in 600 KLPD Distillery based on B/C Heavy Molasses /Sugarcane Juice/Syrup without any enhancement in Distillery Production Capacity by TruAlt Bio Energy Ltd., Unit -2 is a proposed industrial project in Alabal, Jamkhandi, Bagalkote, Karnataka. The site covers 23.5 acres. Its stated project cost is ₹235.9 crore. As of 27 Nov 2026, its status is “Initial checks” (since 18 Apr 2025).

See it on the live map All projects in Bagalkote

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Addition of Grain as a Raw Material in 600 KLPD Distillery based on B/C Heavy Molasses /Sugarcane Juice/Syrup without any enhancement in Distillery Production Capacity by TruAlt Bio Energy Ltd., Unit -2 is a proposed industrial project in Alabal, Jamkhandi, Bagalkote, Karnataka. The site covers 23.5 acres.

Who is building it?

The applicant is TRUALT BIOENERGY LIMITED- Unit 2.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Alabal, Jamkhandi, Bagalkote, Karnataka.

How big is it?

It has a stated cost of ₹235.9 crore and a site of 23.5 acres.

When was it filed?

The application was filed on 18 Apr 2025.

Project details

StatusInitial checks
Status since18 Apr 2025
Application filed18 Apr 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantTRUALT BIOENERGY LIMITED- Unit 2
Land area23.5 acres (9.5 ha)
Project cost₹235.9 crore
Village / localityAlabal
Taluk / tehsilJamkhandi
DistrictBagalkote
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-04188

In context

61 applications in Bagalkote since January 2022 are in the same category (Industry): 39 approved, 11 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 23.5 acres, this one is smaller than 90% of them.

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Alabal, Jamkhandi, Bagalkote, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.