Quick answers
What is Kharland to Nethravathi River From Kannuru to Bajal?
Kharland to Nethravathi River From Kannuru to Bajal is an approved project in 85 Jappina Mogaru B, Mangaluru, Dakshina Kannada, Karnataka. The site covers 3.7 acres.
Who is building it?
The applicant is Executive Engineer Minor Irrigation Department.
Has it been approved?
Yes. Its status is “Coastal clearance granted” (since 22 Jan 2025), as of 27 Nov 2026.
Where is it?
In 85 Jappina Mogaru B, Mangaluru, Dakshina Kannada, Karnataka.
How big is it?
It has a stated cost of ₹8 crore and a site of 3.7 acres.
When was it filed?
The application was filed on 28 Nov 2024.
Project details
| Official title | Construction of Kharland to Nethravathi River From Kannuru to Bajal in Mangaluru Taluk of Dakshina |
|---|---|
| Status | Coastal clearance granted |
| Status since | 22 Jan 2025 |
| Application filed | 28 Nov 2024 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Other |
| Applicant | Executive Engineer Minor Irrigation Department |
| Land area | 3.7 acres (1.5 ha) |
| Project cost | ₹8 crore |
| Village / locality | 85 Jappina Mogaru B |
| Taluk / tehsil | Mangaluru |
| District | Dakshina Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08451 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 28 Nov 2024 (this page) | Coastal clearance granted | 3.7 acres | ₹8 crore |
| New project filed 27 Feb 2024 | Lapsed | ₹8 crore |
In context
52 applications in Dakshina Kannada since January 2022 are in the same category (Other): 15 approved, 7 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.7 acres, this one is larger than 62% of them.
82 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
85 Jappina Mogaru B, Mangaluru, Dakshina Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kharland to Nethravathi River From Kannuru to Bajal — lapsed, 50 m away
- M/S Somanatha Boat Building Yard and Repairs — lapsed, 100 m away
- M/S Somanatha Boat Building Yard & Repairs — lapsed, 100 m away
- Canara Sea Kraft — lapsed, 150 m away
- Creation of Berthing and Landside Facilities at Jeppina Mogaru NH Bridge,… — lapsed, 450 m away
- Supreme Kumar — lapsed, 550 m away
- Creation of berthing and landside facilities at Jeppina Mogeru NH Bridge,… — coastal clearance granted, 700 m away
- Heafford Institute of Advanced Care — under environmental review, 950 m away
More from Executive Engineer Minor Irrigation Department in Dakshina Kannada
- River Bank Protection Work at Dota — under coastal review
- A. Project Name Construction of River Bank Protection Work at Margathale — lapsed
- River bank protection work to Nethravathi River at Gattikudru — lapsed
- River Bank Protection Work at Uliya- Gurikara — lapsed
- Kharland at Karithota — lapsed
- Kharland to Left Bank of Nethravathi River Near Harekala Kadavu — coastal clearance granted
All 14 Executive Engineer Minor Irrigation Department, Karnataka projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.