Quick answers
What is River Bank Protection Work at Uliya- Gurikara?
River Bank Protection Work at Uliya- Gurikara is a lapsed building project in Ullal, Mangaluru, Dakshina Kannada, Karnataka.
Who is building it?
The applicant is Executive Engineer Minor Irrigation Department.
Has it been approved?
No. The application was lapsed on 5 Mar 2026, so it is no longer under consideration.
Where is it?
In Ullal, Mangaluru, Dakshina Kannada, Karnataka.
How big is it?
It has a stated cost of ₹20 lakh.
When was it filed?
The application was filed on 29 Jan 2025.
Project details
| Official title | Construction of River Bank Protection Work at Uliya- Gurikara in Ullala Village of Ullala Taluk Daksina Kannaada District |
|---|---|
| Status | Lapsed |
| Status since | 5 Mar 2026 |
| Application filed | 29 Jan 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Executive Engineer Minor Irrigation Department |
| Project cost | ₹20 lakh |
| Village / locality | Ullal |
| Taluk / tehsil | Mangaluru |
| District | Dakshina Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08633 |
In context
236 applications in Dakshina Kannada since January 2022 are in the same category (Buildings & townships): 110 approved, 39 filed or under review, and 85 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval.
78 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ullal, Mangaluru, Dakshina Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- A. Project Name Construction of River Bank Protection Work at Margathale — lapsed, 800 m away
- CA signature, Commercial and Residential Apartment — coastal clearance granted, 1.2 km away
- CA Signature ,Commercial Cum Residential Apartment — lapsed, 1.2 km away
- Residential House by Maimuna — coastal clearance granted, 1.5 km away
- Residential Building by Mariam Thamima — lapsed, 1.6 km away
- CRZ Clearance for installation of Biofilter in Ullal Fish Meal and Oil Company — lapsed, 1.6 km away
- Road development work at Mangalore to Kerala national highway near NETRAVATHI… — lapsed, 1.6 km away
- CRZ Clearance for Installation of Biofilter in Haris Marine Products at… — lapsed, 1.8 km away
More from Executive Engineer Minor Irrigation Department in Dakshina Kannada
- River Bank Protection Work at Dota — under coastal review
- A. Project Name Construction of River Bank Protection Work at Margathale — lapsed
- River bank protection work to Nethravathi River at Gattikudru — lapsed
- Kharland at Karithota — lapsed
- Kharland to Nethravathi River From Kannuru to Bajal — coastal clearance granted
- Kharland to Left Bank of Nethravathi River Near Harekala Kadavu — coastal clearance granted
All 14 Executive Engineer Minor Irrigation Department, Karnataka projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.