Quick answers
What is Kharland at Karithota?
Kharland at Karithota is a lapsed building project in Chelairu, Mangaluru, Dakshina Kannada, Karnataka. The site covers 4.4 acres.
Who is building it?
The applicant is Executive Engineer Minor Irrigation Department.
Has it been approved?
No. The application was lapsed on 4 Jan 2025, so it is no longer under consideration.
Where is it?
In Chelairu, Mangaluru, Dakshina Kannada, Karnataka.
How big is it?
It has a stated cost of ₹6 crore and a site of 4.4 acres.
When was it filed?
The application was filed on 4 Dec 2024.
Project details
| Official title | Construction of Kharland at Karithota in Haleyangadi Village of Mangaluru Taluk in Dakshina |
|---|---|
| Status | Lapsed |
| Status since | 4 Jan 2025 |
| Application filed | 4 Dec 2024 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Executive Engineer Minor Irrigation Department |
| Land area | 4.4 acres (1.8 ha) |
| Project cost | ₹6 crore |
| Village / locality | Chelairu |
| Taluk / tehsil | Mangaluru |
| District | Dakshina Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08688 |
In context
236 applications in Dakshina Kannada since January 2022 are in the same category (Buildings & townships): 110 approved, 39 filed or under review, and 85 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.4 acres, this one is larger than 79% of them.
73 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chelairu, Mangaluru, Dakshina Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kharland at Karithota — coastal clearance granted, 200 m away
- Kharland at Karithota — lapsed, 450 m away
- Kharland at Karithota — lapsed, 450 m away
- Residential Building by Shivananda Hanumantha Maruthi — coastal clearance granted, 550 m away
- Residential Building by Ramachandra Devadiga — coastal clearance granted, 750 m away
- Residential Building by Laxmana Devadiga Domba Devadiga — under coastal review, 850 m away
- PROPOSED RE-CONSTRUCTION OF AN EXISTING RESIDENTIAL BUILDING BEARING… — lapsed, 850 m away
- PROPOSED RE-CONSTRUCTION OF AN EXISTING RESIDENTIAL BUILDING BEARING… — lapsed, 850 m away
More from Executive Engineer Minor Irrigation Department in Dakshina Kannada
- River Bank Protection Work at Dota — under coastal review
- A. Project Name Construction of River Bank Protection Work at Margathale — lapsed
- River bank protection work to Nethravathi River at Gattikudru — lapsed
- River Bank Protection Work at Uliya- Gurikara — lapsed
- Kharland to Nethravathi River From Kannuru to Bajal — coastal clearance granted
- Kharland to Left Bank of Nethravathi River Near Harekala Kadavu — coastal clearance granted
All 14 Executive Engineer Minor Irrigation Department, Karnataka projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.