Quick answers
What is this project?
A. Project Name Construction of River Bank Protection Work at Margathale is a lapsed building project in Peramunnoru, Mangaluru, Dakshina Kannada, Karnataka. The site covers 0.5 acres.
Who is building it?
The applicant is Executive Engineer Minor Irrigation Department.
Has it been approved?
No. The application was lapsed on 5 Mar 2026, so it is no longer under consideration.
Where is it?
In Peramunnoru, Mangaluru, Dakshina Kannada, Karnataka.
How big is it?
It has a stated cost of ₹20 lakh and a site of 0.5 acres.
When was it filed?
The application was filed on 30 Jan 2025.
Project details
| Official title | A. Project Name Construction of River Bank Protection Work at Margathale in Ullala Village of Ullala Taluk in Dakshina Kannada District |
|---|---|
| Status | Lapsed |
| Status since | 5 Mar 2026 |
| Application filed | 30 Jan 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Executive Engineer Minor Irrigation Department |
| Land area | 2,000 m² |
| Project cost | ₹20 lakh |
| Village / locality | Peramunnoru |
| Taluk / tehsil | Mangaluru |
| District | Dakshina Kannada |
| State | Karnataka |
| Location from | Site area on record |
| Our reference | WID-KA-08684 |
In context
236 applications in Dakshina Kannada since January 2022 are in the same category (Buildings & townships): 110 approved, 39 filed or under review, and 85 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.5 acres, this one is larger than 59% of them.
71 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Peramunnoru, Mangaluru, Dakshina Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- River Bank Protection Work at Uliya- Gurikara — lapsed, 800 m away
- Road development work at Mangalore to Kerala national highway near NETRAVATHI… — lapsed, 1.2 km away
- CA signature, Commercial and Residential Apartment — coastal clearance granted, 1.7 km away
- CA Signature ,Commercial Cum Residential Apartment — lapsed, 1.7 km away
- Creation of berthing and landside facilities at Jeppina Mogeru NH Bridge,… — coastal clearance granted, 1.8 km away
- Creation of Berthing and Landside Facilities at Jeppina Mogaru NH Bridge,… — lapsed, 1.8 km away
- Modification of Works of Approved Proposal of Waterfront Promenade Development — lapsed, 1.9 km away
- Residential House by Maimuna — coastal clearance granted, 2 km away
More from Executive Engineer Minor Irrigation Department in Dakshina Kannada
- River Bank Protection Work at Dota — under coastal review
- River bank protection work to Nethravathi River at Gattikudru — lapsed
- River Bank Protection Work at Uliya- Gurikara — lapsed
- Kharland at Karithota — lapsed
- Kharland to Nethravathi River From Kannuru to Bajal — coastal clearance granted
- Kharland to Left Bank of Nethravathi River Near Harekala Kadavu — coastal clearance granted
All 14 Executive Engineer Minor Irrigation Department, Karnataka projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.