What is Developing? Open the mapMap

Environmental approval grantedIndustry · Dhule, Maharashtra

Proposed Phosphatic Fertilizer and Allied Products Manufacturing Industry by M/s. Rama Phosphates Ltd. at Plot No. A-5/2, Nardana MIDC Area Phase – I, Tal. Sindkheda, Dist. Dhule, Maharashtra.

Proposed Phosphatic Fertilizer and Allied Products Manufacturing Industry by M/s. Rama Phosphates Ltd. at Plot No. A-5/2, Nardana MIDC Area Phase – I, Tal. Sindkheda, Dist. Dhule, Maharashtra is an approved industrial project in Jatode, Sindkhede, Dhule, Maharashtra. The site covers 31.2 acres. Its stated project cost is ₹95.8 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 29 Aug 2023).

See it on the live map All projects in Dhule

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Phosphatic Fertilizer and Allied Products Manufacturing Industry by M/s. Rama Phosphates Ltd. at Plot No. A-5/2, Nardana MIDC Area Phase – I, Tal. Sindkheda, Dist. Dhule, Maharashtra is an approved industrial project in Jatode, Sindkhede, Dhule, Maharashtra. The site covers 31.2 acres.

Who is building it?

The applicant is Rama Phosphates Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 29 Aug 2023), as of 27 Nov 2026.

Where is it?

In Jatode, Sindkhede, Dhule, Maharashtra.

How big is it?

It has a stated cost of ₹95.8 crore and a site of 31.2 acres.

When was it filed?

The application was filed on 29 Aug 2023.

Project details

StatusEnvironmental approval granted
Status since29 Aug 2023
Application filed29 Aug 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantRama Phosphates Limited
Land area31.2 acres (12.6 ha)
Project cost₹95.8 crore
Village / localityJatode
Taluk / tehsilSindkhede
DistrictDhule
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-00901

In context

31 applications in Dhule since January 2022 are in the same category (Industry): 19 approved, 9 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 31.2 acres, this one is larger than 61% of them.

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Jatode, Sindkhede, Dhule, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Rama Phosphates Limited in Dhule

All 3 Rama Phosphates projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.