Amendment in Environmental Clearance for 2x150 MW coal based Power Plant at MIDC Nardana, District- Dhule, Maharashtra is an approved power project in Jatode, Sindkhede, Dhule, Maharashtra. The site covers 284.2 acres.
Who is building it?
The applicant is Jindal Power Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 5 Nov 2026), as of 27 Nov 2026.
Where is it?
In Jatode, Sindkhede, Dhule, Maharashtra.
How big is it?
It has a stated cost of ₹433.2 crore and a site of 284.2 acres.
When was it filed?
The application was filed on 1 Oct 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 5 Nov 2026 |
| Application filed | 1 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Power |
| Applicant | Jindal Power Limited |
| Land area | 284.2 acres (115 ha) |
| Project cost | ₹433.2 crore |
| Village / locality | Jatode |
| Taluk / tehsil | Sindkhede |
| District | Dhule |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-11595 |
In context
14 applications in Dhule since January 2022 are in the same category (Power): 2 approved, 7 filed or under review, and 5 withdrawn, lapsed or rejected. At 284.2 acres, this one is larger than 50% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jatode, Sindkhede, Dhule, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 2x150 MW coal based Power Plant at MIDC Nardana, District- Dhule, Maharashtra — environmental approval granted, 0 m away
- Expansion in Cement Production Capacity of Existing Standalone Clinker… — environmental approval granted, 450 m away
- Expansion in Cement Production Capacity of Existing Standalone Clinker… — cleared for impact study, 450 m away
- Proposed Phosphatic Fertilizer and Allied Products Manufacturing Industry by… — environmental approval granted, 2.5 km away
- Proposed expansion of chemical fertilizer manufacturing unit including non-EC… — cleared for impact study, 2.6 km away
- Expansion of Chemical Fertilizer Plant at Plot: A- 5/1, 5/2 Nardana; MIDC… — cleared for impact study, 2.6 km away
- Proposed Green Field Synthetic Organic Chemicals Manufacturing Plant at Plot… — environmental approval granted, 7.1 km away
- Proposed Green Field Synthetic Organic Chemicals Manufacturing Plant at Plot… — cleared for impact study, 7.1 km away
More from Jindal Power Limited in Dhule
- 2x150 MW coal based Power Plant at MIDC Nardana, District- Dhule, Maharashtra — environmental approval granted
All 27 Jindal Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.