Expansion in Cement Production Capacity of Existing Standalone Clinker Grinding Unit from 3.0 Million TPA to 3.6 Million TPA at Plot No. 3, Nardana Industrial Area, MIDC Phase 1, Village: Waghode, Tehsil: Shindkhede, District: Dhule by M/s. UltraTech Cement Limited (Unit: Dhule Cement Works) is a proposed industrial project in Vaghode, Sindkhede, Dhule, Maharashtra. The site covers 64.5 acres.
Who is building it?
The applicant is M/s. UltraTech Cement Ltd..
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 20 Dec 2023), as of 27 Nov 2026.
Where is it?
In Vaghode, Sindkhede, Dhule, Maharashtra.
How big is it?
It has a stated cost of ₹607 crore and a site of 64.5 acres.
When was it filed?
The application was filed on 20 Dec 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion in Cement Production Capacity of Existing Standalone Clinker Grinding Unit…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 20 Dec 2023 |
| Application filed | 20 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | M/s. UltraTech Cement Ltd. |
| Land area | 64.5 acres (26.1 ha) |
| Project cost | ₹607 crore |
| Village / locality | Vaghode |
| Taluk / tehsil | Sindkhede |
| District | Dhule |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-02203 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 25 Jun 2024 | Environmental approval granted | 64.5 acres | ₹607 crore |
| Early planning filed 20 Dec 2023 (this page) | Cleared for impact study | 64.5 acres | ₹607 crore |
In context
31 applications in Dhule since January 2022 are in the same category (Industry): 19 approved, 9 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 64.5 acres, this one is larger than 74% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vaghode, Sindkhede, Dhule, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in Cement Production Capacity of Existing Standalone Clinker… — environmental approval granted, 0 m away
- Amendment in Environmental Clearance for 2x150 MW coal based Power Plant at… — environmental approval granted, 450 m away
- 2x150 MW coal based Power Plant at MIDC Nardana, District- Dhule, Maharashtra — environmental approval granted, 450 m away
- Proposed Phosphatic Fertilizer and Allied Products Manufacturing Industry by… — environmental approval granted, 2.7 km away
- Proposed expansion of chemical fertilizer manufacturing unit including non-EC… — cleared for impact study, 2.8 km away
- Expansion of Chemical Fertilizer Plant at Plot: A- 5/1, 5/2 Nardana; MIDC… — cleared for impact study, 2.8 km away
- Proposed Green Field Synthetic Organic Chemicals Manufacturing Plant at Plot… — environmental approval granted, 6.7 km away
- Proposed Green Field Synthetic Organic Chemicals Manufacturing Plant at Plot… — cleared for impact study, 6.7 km away
All 182 UltraTech Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.