What is Developing? Open the mapMap

Cleared for impact studyIndustry · Dhule, Maharashtra

Proposed expansion of chemical fertilizer manufacturing unit including non-EC products located at Plot No. A-5/1 and A-5/2 Nardana Industrial Area, MIDC Phase–I, Taluka-Sindkheda, District-Dhule (Maharashtra)

Proposed expansion of chemical fertilizer manufacturing unit including non-EC products located at Plot No. A-5/1 and A-5/2 Nardana Industrial Area, MIDC Phase–I, Taluka-Sindkheda, District-Dhule (Maharashtra) is a proposed industrial project in Melane, Sindkhede, Dhule, Maharashtra. The site covers 52 acres. Its stated project cost is ₹1.8 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 29 Oct 2026).

See it on the live map All projects in Dhule

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed expansion of chemical fertilizer manufacturing unit including non-EC products located at Plot No. A-5/1 and A-5/2 Nardana Industrial Area, MIDC Phase–I, Taluka-Sindkheda, District-Dhule (Maharashtra) is a proposed industrial project in Melane, Sindkhede, Dhule, Maharashtra. The site covers 52 acres.

Who is building it?

The applicant is Rama Phosphates Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 29 Oct 2026), as of 27 Nov 2026.

Where is it?

In Melane, Sindkhede, Dhule, Maharashtra.

How big is it?

It has a stated cost of ₹1.8 crore and a site of 52 acres.

When was it filed?

The application was filed on 13 Oct 2026.

Project details

StatusCleared for impact study
Status since29 Oct 2026
Application filed13 Oct 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantRama Phosphates Limited
Land area52 acres (21 ha)
Project cost₹1.8 crore
Village / localityMelane
Taluk / tehsilSindkhede
DistrictDhule
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-12875

In context

31 applications in Dhule since January 2022 are in the same category (Industry): 19 approved, 9 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 52 acres, this one is larger than 68% of them.

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Melane, Sindkhede, Dhule, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Rama Phosphates Limited in Dhule

All 3 Rama Phosphates projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.