Quick answers
What is this project?
Proposed expansion of chemical fertilizer manufacturing unit including non-EC products located at Plot No. A-5/1 and A-5/2 Nardana Industrial Area, MIDC Phase–I, Taluka-Sindkheda, District-Dhule (Maharashtra) is a proposed industrial project in Melane, Sindkhede, Dhule, Maharashtra. The site covers 52 acres.
Who is building it?
The applicant is Rama Phosphates Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 29 Oct 2026), as of 27 Nov 2026.
Where is it?
In Melane, Sindkhede, Dhule, Maharashtra.
How big is it?
It has a stated cost of ₹1.8 crore and a site of 52 acres.
When was it filed?
The application was filed on 13 Oct 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 29 Oct 2026 |
| Application filed | 13 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Rama Phosphates Limited |
| Land area | 52 acres (21 ha) |
| Project cost | ₹1.8 crore |
| Village / locality | Melane |
| Taluk / tehsil | Sindkhede |
| District | Dhule |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-12875 |
In context
31 applications in Dhule since January 2022 are in the same category (Industry): 19 approved, 9 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 52 acres, this one is larger than 68% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Melane, Sindkhede, Dhule, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Chemical Fertilizer Plant at Plot: A- 5/1, 5/2 Nardana; MIDC… — cleared for impact study, 0 m away
- Proposed Phosphatic Fertilizer and Allied Products Manufacturing Industry by… — environmental approval granted, 100 m away
- Amendment in Environmental Clearance for 2x150 MW coal based Power Plant at… — environmental approval granted, 2.6 km away
- 2x150 MW coal based Power Plant at MIDC Nardana, District- Dhule, Maharashtra — environmental approval granted, 2.6 km away
- Expansion in Cement Production Capacity of Existing Standalone Clinker… — environmental approval granted, 2.8 km away
- Expansion in Cement Production Capacity of Existing Standalone Clinker… — cleared for impact study, 2.8 km away
- Proposed Metallurgical Unit with pickling facility by H D Wire Private Limited — environmental approval granted, 6.8 km away
- Proposed Manufacturing of Unsaturated Polyester Resin (USPR) Unit by M/s. ADAC… — initial checks, 8.9 km away
More from Rama Phosphates Limited in Dhule
- Expansion of Chemical Fertilizer Plant at Plot: A- 5/1, 5/2 Nardana; MIDC… — cleared for impact study
- Proposed Phosphatic Fertilizer and Allied Products Manufacturing Industry by… — environmental approval granted
All 3 Rama Phosphates projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.