Quick answers
What is 4G Saturation BSNL- Shedwahi Bhari Land for the Tower?
4G Saturation BSNL- Shedwahi Bhari Land for the Tower is a lapsed telecom project in Sedwahi (Bhari), Rajura, Chandrapur, Maharashtra. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 18 Jul 2023, so it is no longer under consideration.
Where is it?
In Sedwahi (Bhari), Rajura, Chandrapur, Maharashtra.
How big is it?
It has a stated cost of ₹65 lakh; a site of 0 acres and 180 m² of forest land.
When was it filed?
The application was filed on 20 Dec 2022.
Project details
| Status | Lapsed |
|---|---|
| Status since | 18 Jul 2023 |
| Application filed | 20 Dec 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 180 m² |
| Project cost | ₹65 lakh |
| Village / locality | Sedwahi (Bhari) |
| Taluk / tehsil | Rajura |
| District | Chandrapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14388 |
In context
15 applications in Chandrapur since January 2022 are in the same category (Telecom): 0 approved, 5 filed or under review, and 10 withdrawn, lapsed or rejected.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sedwahi (Bhari), Rajura, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G Saturation BSNL- Village BABAPUR Tal Jiwati Land for the Tower — lapsed, 1.9 km away
- Diversion of 293.86 Ha of Forest Land for Mining Lease of Limestone… — lapsed, 2 km away
- Preliminary Exploration for locating Limestone deposits in Bhari area, ta.… — forest land use approved, 3.9 km away
- Preliminary Exploration for locating Limestone deposits in Bhari area, ta.… — lapsed, 3.9 km away
- Preliminary Exploration(G-3) of Alluminious Laterite/Laterite Deposit and… — forest land use approved, 10.6 km away
- Environmental Clearance for Markagondi Laterite Mine (Lease area -52.5728 Ha)… — environmental approval granted, 12.7 km away
- Regularisation of 5.69 Ha. area Forest land (disputed) under Van (Sanrakshan… — lapsed, 17.7 km away
- Forest Clearance Proposal of 229 ha for Limestone Mining — more information requested, 18.4 km away
More from Mahesh Nair in Chandrapur
- Diversion of 0.2Ha. Forest Land for installation of 4G Mobile Towers at 10… — more information requested
- Diversion of 0.66Ha. Forest Land for installation of 4G Mobile Towers for 4G… — lapsed
- Diversion of Land of area 0.018 ha — lapsed
- Diversion of Land of area 0.018 ha — lapsed
- 4G Saturation BSNL- Village Alphar alias Satara Tal WARORA Land for the Tower — lapsed
- 4G Saturation BSNL- Village WANDHALI Tal WARORA Land for the Tower — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.