Quick answers
What is this project?
Diversion of 0.2Ha. Forest Land for installation of 4G Mobile Towers at 10 villages for 4G Saturation project under Chandrapur Forest Division is a proposed building project in Alpharalias Satara, Warora, Chandrapur, Maharashtra. The site covers 62.4 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Alpharalias Satara, Warora, Chandrapur, Maharashtra.
How big is it?
It has a stated cost of ₹9.1 crore; a site of 62.4 acres and 2,000 m² of forest land.
When was it filed?
The application was filed on 12 May 2023.
Project details
| Status | More information requested |
|---|---|
| Status since | 15 Oct 2026 |
| Application filed | 12 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mahesh Nair |
| Land area | 62.4 acres (25.2 ha) |
| Forest land | 2,000 m² |
| Project cost | ₹9.1 crore |
| Village / locality | Alpharalias Satara |
| Taluk / tehsil | Warora |
| District | Chandrapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16259 |
In context
26 applications in Chandrapur since January 2022 are in the same category (Buildings & townships): 1 approved, 17 filed or under review, and 8 withdrawn, lapsed or rejected. At 62.4 acres, this one is larger than 73% of them.
Where it is
Alpharalias Satara, Warora, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of forest Land of Laying Underground OFC along the existing Right of… — more information requested, 6.3 km away
- Greenfield Project comprising of establishment of DRI Kilns (Sponge iron –… — lapsed, 7.7 km away
- Greenfield Project comprising of establishment of DRI Kilns (Sponge iron –… — environmental approval granted, 7.7 km away
- Greenfield Project comprising of establishment of DRI Kilns (Sponge iron –… — cleared for impact study, 7.7 km away
- 2X350 TPD DRI Plant for Production of 2,31,000 TPA of Sponge Iron, 2 X 40 T of… — environmental approval granted, 10.2 km away
- 2X350 TPD DRI Plant for Production of 2,31,000 TPA of Sponge Iron, 2 X 40 T of… — cleared for impact study, 10.2 km away
- Environmental Clearance for the proposed Sponge Iron 180 TPD, 30 MW Power… — environmental approval granted, 10.4 km away
- Proposed Expansion of DRI Kilns (Sponge Iron) from 33,000 TPA to 3,96,000 TPA… — cleared for impact study, 10.4 km away
More from Mahesh Nair in Chandrapur
- Diversion of 0.66Ha. Forest Land for installation of 4G Mobile Towers for 4G… — lapsed
- Diversion of Land of area 0.018 ha — lapsed
- Diversion of Land of area 0.018 ha — lapsed
- 4G Saturation BSNL- Village Alphar alias Satara Tal WARORA Land for the Tower — lapsed
- 4G Saturation BSNL- Village WANDHALI Tal WARORA Land for the Tower — lapsed
- 4G Saturation BSNL- Village BABAPUR Tal Jiwati Land for the Tower — lapsed