What is this project?
4G Saturation BSNL- Village Alphar alias Satara Tal WARORA Land for the Tower is a lapsed building project in Alpharalias Satara, Warora, Chandrapur, Maharashtra. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 18 Jul 2023, so it is no longer under consideration.
Where is it?
In Alpharalias Satara, Warora, Chandrapur, Maharashtra.
How big is it?
It has a stated cost of ₹65 lakh; a site of 0 acres and 180 m² of forest land.
When was it filed?
The application was filed on 27 Dec 2022.
Project details
| Status | Lapsed |
|---|---|
| Status since | 18 Jul 2023 |
| Application filed | 27 Dec 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 180 m² |
| Project cost | ₹65 lakh |
| Village / locality | Alpharalias Satara |
| Taluk / tehsil | Warora |
| District | Chandrapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14947 |
In context
26 applications in Chandrapur since January 2022 are in the same category (Buildings & townships): 1 approved, 17 filed or under review, and 8 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
Where it is
Alpharalias Satara, Warora, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Pimpalgaon Singru Stone Quarry Mining Project, Lease Area 1.05 Hectare Mauza:… — environmental approval granted, 11.6 km away
- Stone & Murrum Quarry Project by Shri. Swapnil Eknath Patil — environmental approval granted, 12 km away
- Fattapur Minor Mineral Lease for Stone Mining Project — environmental approval granted, 12.1 km away
- Fattapur Stone Quarry Mining Project. — environmental approval granted, 12.5 km away
- Barva Stone Quarry Proposed Lease area 3.91 ha out of 4.91 ha, survey no. 169,… — environmental approval granted, 12.8 km away
- 2 x350 DRI Kilns for 2,31,000 TPA Production of Sponge Iron, Steel Melting… — environmental approval granted, 17.4 km away
- 2 x350 DRI Kilns for 2,31,000 TPA Production of Sponge Iron, Steel Melting… — cleared for impact study, 17.4 km away
- Diversion of 6.36 Ha. Zudpi (Revenue) forest area for Proposed Kondhala… — under forest review, 17.9 km away
More from Mahesh Nair in Chandrapur
- Diversion of 0.2Ha. Forest Land for installation of 4G Mobile Towers at 10… — more information requested
- Diversion of 0.66Ha. Forest Land for installation of 4G Mobile Towers for 4G… — lapsed
- Diversion of Land of area 0.018 ha — lapsed
- Diversion of Land of area 0.018 ha — lapsed
- 4G Saturation BSNL- Village WANDHALI Tal WARORA Land for the Tower — lapsed
- 4G Saturation BSNL- Village BABAPUR Tal Jiwati Land for the Tower — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.