Quick answers
What is this project?
Proposed Mining of Manganese (Major Mineral), with maximum production capacity of 1200 TPA (ROM), over an area 4.42 ha (precisely 4.419 ha) by M/s MOIL Limited is an approved mining project in Tirodi, Balaghat, Madhya Pradesh. The site covers 10.9 acres.
Who is building it?
The applicant is M/S Manganese Ore India Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 13 Sept 2023), as of 27 Nov 2026.
Where is it?
In Tirodi, Balaghat, Madhya Pradesh.
How big is it?
It has a stated cost of ₹2.2 crore and a site of 10.9 acres.
When was it filed?
The application was filed on 13 Sept 2023.
Project details
| Official title | Proposed Mining of Manganese (Major Mineral), with maximum production capacity of 1200 TPA (ROM), over an area 4.42 ha (precisely 4.419 ha) located at village-Tirodi, Tehsil- Tirodi, District Balaghat, M.P by M/s MOIL Limited. |
|---|---|
| Status | Environmental approval granted |
| Status since | 13 Sept 2023 |
| Application filed | 13 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | M/S Manganese Ore India Limited |
| Land area | 10.9 acres (4.4 ha) |
| Project cost | ₹2.2 crore |
| Village / locality | Tirodi |
| Taluk / tehsil | Tirodi |
| District | Balaghat |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-00508 |
In context
204 applications in Balaghat since January 2022 are in the same category (Mining): 113 approved, 51 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 29 days from filing to approval. At 10.9 acres, this one is smaller than 54% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Tirodi, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of Environmental Clearance of Tirodi Manganese Ore Mining Project — environmental approval granted, 600 m away
- Tirodi Manganese Ore Mining Project (ML area 254.593 ha) and expansion in… — under environmental review, 950 m away
- Tirodi Manganese Ore Mining Project (ML area 254.593 ha) and expansion in… — more information requested, 950 m away
- Tirodi Manganese Ore Mining Project (ML area 254.593 ha) and expansion in… — cleared for impact study, 950 m away
- Expansion of Tirodi Manganese Ore Mine From Production Capacity of 3700 Tpa to… — under environmental review, 1.1 km away
- Submersible bridge across Doriya Nalla on Kharpadiya - Shivanheti Road In… — lapsed, 2.1 km away
- MOIL Limited-Tirodi Mine-Forest Land — lapsed, 2.4 km away
- Sitapathore exploration Block — forest land use approved, 4.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.