Quick answers
What is this project?
Transfer of Environmental Clearance of Tirodi Manganese Ore Mining Project is an approved mining project in Pauniya, Tirodi, Balaghat, Madhya Pradesh. The site covers 1,181.3 acres.
Who is building it?
The applicant is Vikash Parida.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 12 Oct 2023), as of 27 Nov 2026.
Where is it?
In Pauniya, Tirodi, Balaghat, Madhya Pradesh.
How big is it?
It has a stated cost of ₹63.2 crore and a site of 1,181.3 acres.
When was it filed?
The application was filed on 18 Sept 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Oct 2023 |
| Application filed | 18 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Vikash Parida |
| Land area | 1,181.3 acres (478 ha) |
| Project cost | ₹63.2 crore |
| Village / locality | Pauniya |
| Taluk / tehsil | Tirodi |
| District | Balaghat |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-02271 |
In context
204 applications in Balaghat since January 2022 are in the same category (Mining): 113 approved, 51 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 29 days from filing to approval. At 1,181.3 acres, this one is larger than 99% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Pauniya, Tirodi, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Mining of Manganese (Major Mineral), with maximum production capacity… — environmental approval granted, 600 m away
- Tirodi Manganese Ore Mining Project (ML area 254.593 ha) and expansion in… — under environmental review, 850 m away
- Tirodi Manganese Ore Mining Project (ML area 254.593 ha) and expansion in… — more information requested, 850 m away
- Tirodi Manganese Ore Mining Project (ML area 254.593 ha) and expansion in… — cleared for impact study, 850 m away
- Expansion of Tirodi Manganese Ore Mine From Production Capacity of 3700 Tpa to… — under environmental review, 1.4 km away
- MOIL Limited-Tirodi Mine-Forest Land — lapsed, 2.2 km away
- Submersible bridge across Doriya Nalla on Kharpadiya - Shivanheti Road In… — lapsed, 2.7 km away
- Sonegaon Manganese ore mine (4.998ha) with production capacity of ROM-11774TPA… — environmental approval granted, 4.6 km away
More from Vikash Parida in Balaghat
- Tirodi Manganese Ore Mining Project (ML area 254.593 ha) and expansion in… — under environmental review
- Tirodi Manganese Ore Mining Project (ML area 254.593 ha) and expansion in… — more information requested
- Kanki Sand Mining Lease of MOIL Limited over an area of 4.413 Ha, at Khasra… — lapsed
- MOIL-Sukli Forest for Drilling — forest land use approved
- Kanki Sand Mining Lease of MOIL Limited over an area of 4.413 Ha, at Khasra… — lapsed
- Kanki Sand Mining Lease of MOIL Limited over an area of 4.413 Ha, at Khasra… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.