Quick answers
What is this project?
Expansion of Tirodi Manganese Ore Mine From Production Capacity of 3700 Tpa to 80,060.50 Tpa in an Area of 37.09 Ha is a proposed mining project in Tirodi (Ct), Tirodi, Balaghat, Madhya Pradesh. The site covers 91.7 acres.
Who is building it?
The applicant is Moil Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Tirodi (Ct), Tirodi, Balaghat, Madhya Pradesh.
How big is it?
It has a stated cost of ₹5 crore and a site of 91.7 acres.
When was it filed?
The application was filed on 3 Sept 2026.
Project details
| Official title | Expansion of Tirodi Manganese Ore Mine From Production Capacity of 3700 Tpa to 80,060.50 Tpa in an Area of 37.09 Ha at Tirodi Village, Tirodi Tehsil, Balaghat District, Madhya Pradesh |
|---|---|
| Status | Under environmental review |
| Status since | 19 Sept 2026 |
| Application filed | 3 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Moil Limited |
| Land area | 91.7 acres (37.1 ha) |
| Project cost | ₹5 crore |
| Village / locality | Tirodi (Ct) |
| Taluk / tehsil | Tirodi |
| District | Balaghat |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-08846 |
In context
204 applications in Balaghat since January 2022 are in the same category (Mining): 113 approved, 51 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 29 days from filing to approval. At 91.7 acres, this one is larger than 86% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Tirodi (Ct), Tirodi, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tirodi Manganese Ore Mining Project (ML area 254.593 ha) and expansion in… — under environmental review, 800 m away
- Tirodi Manganese Ore Mining Project (ML area 254.593 ha) and expansion in… — more information requested, 800 m away
- Tirodi Manganese Ore Mining Project (ML area 254.593 ha) and expansion in… — cleared for impact study, 800 m away
- Proposed Mining of Manganese (Major Mineral), with maximum production capacity… — environmental approval granted, 1.1 km away
- Transfer of Environmental Clearance of Tirodi Manganese Ore Mining Project — environmental approval granted, 1.4 km away
- Submersible bridge across Doriya Nalla on Kharpadiya - Shivanheti Road In… — lapsed, 1.4 km away
- MOIL Limited-Tirodi Mine-Forest Land — lapsed, 3.5 km away
- Sitapathore exploration Block — forest land use approved, 4.1 km away
More from Moil Limited in Balaghat
- Expansion of Manganese Mines From Production Capacity of 1,20,000 to 2,16,000… — under environmental review
- Expansion of Manganese Mines From Production Capacity of 1,20,000 to 2,16,000… — cleared for impact study
- Proposed Expansion of Balaghat Manganese Ore Mining and Beneficiation plant… — under environmental review
- Proposed Expansion of Balaghat Manganese Ore Mining and Beneficiation plant… — cleared for impact study
- Expansion of Manganese Mines From Production Capacity of 1,20,000 Tpa to… — cleared for impact study
- Expansion of Manganese Mines From Production Capacity of 17000 Tpa to 70000… — environmental approval granted
10 Moil projects in Balaghat
All 25 Moil projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.