Quick answers
What is this project?
Submersible bridge across Doriya Nalla on Kharpadiya - Shivanheti Road In Balaghat Distt is a lapsed road project in Kharpariya, Tirodi, Balaghat, Madhya Pradesh. The site covers 2.5 acres.
Who is building it?
The applicant is Construction of H L Bridge Across Wainganga River i/c approach Road on lamta-Dhuti to Pandiya Chhapara Road in District Seoni.
Has it been approved?
No. The application was lapsed on 13 Nov 2026, so it is no longer under consideration.
Where is it?
In Kharpariya, Tirodi, Balaghat, Madhya Pradesh.
How big is it?
It has a stated cost of ₹8.7 crore; a site of 2.5 acres and 2.5 acres (1 ha) of forest land.
When was it filed?
The application was filed on 8 Oct 2026.
Project details
| Official title | Construction of Submersible bridge across Doriya Nalla on Kharpadiya - Shivanheti Road In Balaghat Distt. |
|---|---|
| Status | Lapsed |
| Status since | 13 Nov 2026 |
| Application filed | 8 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Construction of H L Bridge Across Wainganga River i/c approach Road on lamta-Dhuti to Pandiya Chhapara Road in District Seoni |
| Land area | 2.5 acres (1 ha) |
| Forest land | 2.5 acres (1 ha) |
| Project cost | ₹8.7 crore |
| Village / locality | Kharpariya |
| Taluk / tehsil | Tirodi |
| District | Balaghat |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09871 |
In context
52 applications in Balaghat since January 2022 are in the same category (Roads & highways): 5 approved, 19 filed or under review, and 22 withdrawn, lapsed or rejected. The approved ones took a median of 2.2 years from filing to approval. At 2.5 acres, this one is smaller than 70% of them.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kharpariya, Tirodi, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Tirodi Manganese Ore Mine From Production Capacity of 3700 Tpa to… — under environmental review, 1.4 km away
- Proposed Mining of Manganese (Major Mineral), with maximum production capacity… — environmental approval granted, 2.1 km away
- Tirodi Manganese Ore Mining Project (ML area 254.593 ha) and expansion in… — under environmental review, 2.2 km away
- Tirodi Manganese Ore Mining Project (ML area 254.593 ha) and expansion in… — more information requested, 2.2 km away
- Tirodi Manganese Ore Mining Project (ML area 254.593 ha) and expansion in… — cleared for impact study, 2.2 km away
- Transfer of Environmental Clearance of Tirodi Manganese Ore Mining Project — environmental approval granted, 2.7 km away
- Sitapathore exploration Block — forest land use approved, 3 km away
- Preliminary investigation for Manganese in Sausar Group of rocks in Kharpariya… — forest land use approved, 3.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.