Quick answers
What is this project?
Expansion of existing Coal Based Sub-Critical Thermal Power Plant from 2X600 MW (1200MW) to 2X630 MW (1260 MW) under clause 7(ii)(a) of EIA Notification 2006 amended from time to time at Villages: Laharpur, Murra, Guwari, Belia & Jaithari, Tehsil: Jaithari & Anuppur, District: Anuppur (Madhya Pradesh) is an approved power project in Gumaria, Jaithari, Anuppur, Madhya Pradesh. The site covers 996 acres.
Who is building it?
The applicant is Mb Power (Madhya Pradesh) Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 7 May 2024), as of 27 Nov 2026.
Where is it?
In Gumaria, Jaithari, Anuppur, Madhya Pradesh.
How big is it?
It has a stated cost of ₹8,674.5 crore and a site of 996 acres.
When was it filed?
The application was filed on 5 Feb 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 May 2024 |
| Application filed | 5 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Power |
| Applicant | Mb Power (Madhya Pradesh) Limited |
| Land area | 996 acres (403.1 ha) |
| Project cost | ₹8,674.5 crore |
| Village / locality | Gumaria |
| Taluk / tehsil | Jaithari |
| District | Anuppur |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-03890 |
In context
34 applications in Anuppur since January 2022 are in the same category (Power): 13 approved, 7 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 996 acres, this one is larger than 79% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gumaria, Jaithari, Anuppur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 2x 600 MW Sub-Critical Coal Based Thermal Power Plant — initial checks, 0 m away
- EXPANSION BY ADDITION OF 2x800 MW (1600 MW) COAL BASED ULTRA SUPER CRITICAL… — lapsed, 50 m away
- EXPANSION BY ADDITION OF 2x800 MW (1600 MW) COAL BASED ULTRA SUPER CRITICAL… — under forest review, 50 m away
- EXPANSION BY ADDITION OF 2x800 MW (1600 MW) COAL BASED ULTRA SUPER CRITICAL… — environmental approval granted, 50 m away
- EXPANSION BY ADDITION OF 2x800 MW (1600 MW) COAL BASED ULTRA SUPER CRITICAL… — cleared for impact study, 50 m away
- Splitting of Environmental Clearance granted for 2,860 MW [2X630 MW (Phase-I)… — more information requested, 100 m away
- Jaithari Gobri Sand Mine — cleared for impact study, 3.3 km away
- New Kanya shiksha parishar Jaithari — forest land use approved, 4.1 km away
More from Mb Power (Madhya Pradesh) Limited in Anuppur
- Splitting of Environmental Clearance granted for 2,860 MW [2X630 MW (Phase-I)… — more information requested
- EXPANSION BY ADDITION OF 2x800 MW (1600 MW) COAL BASED ULTRA SUPER CRITICAL… — lapsed
- EXPANSION BY ADDITION OF 2x800 MW (1600 MW) COAL BASED ULTRA SUPER CRITICAL… — under forest review
- EXPANSION BY ADDITION OF 2x800 MW (1600 MW) COAL BASED ULTRA SUPER CRITICAL… — environmental approval granted
- EXPANSION BY ADDITION OF 2x800 MW (1600 MW) COAL BASED ULTRA SUPER CRITICAL… — cleared for impact study
All 6 Mb Power (Madhya Pradesh) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.