EXPANSION BY ADDITION OF 2x800 MW (1600 MW) COAL BASED ULTRA SUPER CRITICAL THERMAL POWER PLANT TO EXISTING 2 x 630 MW (1260 MW) MB POWER (MADHYA PRADESH) LIMITED

EXPANSION BY ADDITION OF 2x800 MW (1600 MW) COAL BASED ULTRA SUPER CRITICAL THERMAL POWER PLANT TO EXISTING 2 x 630 MW (1260 MW) MB POWER (MADHYA PRADESH) LIMITED is a lapsed power project in Belia, Anuppur, Madhya Pradesh. The site covers 1,114.9 acres. Its stated project cost is ₹28,200 crore. As of 27 Nov 2026, its status is “Lapsed” (since 4 Oct 2026).

See it on the live map All projects in Anuppur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

EXPANSION BY ADDITION OF 2x800 MW (1600 MW) COAL BASED ULTRA SUPER CRITICAL THERMAL POWER PLANT TO EXISTING 2 x 630 MW (1260 MW) MB POWER (MADHYA PRADESH) LIMITED is a lapsed power project in Belia, Anuppur, Madhya Pradesh. The site covers 1,114.9 acres.

Who is building it?

The applicant is Mb Power (Madhya Pradesh) Limited.

Has it been approved?

No. The application was lapsed on 4 Oct 2026, so it is no longer under consideration.

Where is it?

In Belia, Anuppur, Madhya Pradesh.

How big is it?

It has a stated cost of ₹28,200 crore and a site of 1,114.9 acres.

When was it filed?

The application was filed on 20 May 2026.

One of 4 filings for this project. The project's main page, with every filing and where each stands: EXPANSION BY ADDITION OF 2x800 MW (1600 MW) COAL BASED ULTRA SUPER CRITICAL THERMAL…

Project details

Official titleEXPANSION BY ADDITION OF 2x800 MW (1600 MW) COAL BASED ULTRA SUPER CRITICAL THERMAL POWER PLANT TO EXISTING 2 x 630 MW (1260 MW) MB POWER (MADHYA PRADESH) LIMITED AT VILLAGE LAHARPUR, MURRA, GUWARI, BELIA & JETHARI, IN JAITHARI TEHSIL, ANUPPUR DISTRICT, MADHYA PRADESH
StatusLapsed
Status since4 Oct 2026
Application filed20 May 2026
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorPower
ApplicantMb Power (Madhya Pradesh) Limited
Land area1,114.9 acres (451.2 ha)
Project cost₹28,200 crore
Village / localityBelia
Taluk / tehsilAnuppur
DistrictAnuppur
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-08290

All filings for this project

This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Ownership transfer filed 20 May 2026 (this page)Lapsed1,114.9 acres₹28,200 crore
Ownership transfer filed 25 Sept 2025Under forest review1,114.9 acres₹28,200 crore
Expansion filed 23 Jul 2025Environmental approval granted1,114.9 acres₹28,200 crore
Early planning filed 26 Nov 2024Cleared for impact study1,114.9 acres₹28,200 crore

In context

34 applications in Anuppur since January 2022 are in the same category (Power): 13 approved, 7 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1,114.9 acres, this one is larger than 85% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Belia, Anuppur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Mb Power (Madhya Pradesh) Limited in Anuppur

All 6 Mb Power (Madhya Pradesh) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.