Quick answers
What is this project?
EXPANSION BY ADDITION OF 2x800 MW (1600 MW) COAL BASED ULTRA SUPER CRITICAL THERMAL POWER PLANT TO EXISTING 2 x 630 MW (1260 MW) MB POWER (MADHYA PRADESH) LIMITED is a proposed power project in Belia, Anuppur, Madhya Pradesh. The site covers 1,114.9 acres.
Who is building it?
The applicant is Mb Power (Madhya Pradesh) Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 28 Dec 2024), as of 27 Nov 2026.
Where is it?
In Belia, Anuppur, Madhya Pradesh.
How big is it?
It has a stated cost of ₹28,200 crore and a site of 1,114.9 acres.
When was it filed?
The application was filed on 26 Nov 2024.
One of 4 filings for this project. The project's main page, with every filing and where each stands: EXPANSION BY ADDITION OF 2x800 MW (1600 MW) COAL BASED ULTRA SUPER CRITICAL THERMAL…
Project details
| Official title | EXPANSION BY ADDITION OF 2x800 MW (1600 MW) COAL BASED ULTRA SUPER CRITICAL THERMAL POWER PLANT TO EXISTING 2 x 630 MW (1260 MW) MB POWER (MADHYA PRADESH) LIMITED AT VILLAGE LAHARPUR, MURRA, GUWARI, BELIA & JETHARI, IN JAITHARI TEHSIL, ANUPPUR DISTRICT, MADHYA PRADESH |
|---|---|
| Status | Cleared for impact study |
| Status since | 28 Dec 2024 |
| Application filed | 26 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Power |
| Applicant | Mb Power (Madhya Pradesh) Limited |
| Land area | 1,114.9 acres (451.2 ha) |
| Project cost | ₹28,200 crore |
| Village / locality | Belia |
| Taluk / tehsil | Anuppur |
| District | Anuppur |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-05270 |
All filings for this project
This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 20 May 2026 | Lapsed | 1,114.9 acres | ₹28,200 crore |
| Ownership transfer filed 25 Sept 2025 | Under forest review | 1,114.9 acres | ₹28,200 crore |
| Expansion filed 23 Jul 2025 | Environmental approval granted | 1,114.9 acres | ₹28,200 crore |
| Early planning filed 26 Nov 2024 (this page) | Cleared for impact study | 1,114.9 acres | ₹28,200 crore |
In context
34 applications in Anuppur since January 2022 are in the same category (Power): 13 approved, 7 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1,114.9 acres, this one is larger than 85% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Belia, Anuppur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- EXPANSION BY ADDITION OF 2x800 MW (1600 MW) COAL BASED ULTRA SUPER CRITICAL… — lapsed, 0 m away
- EXPANSION BY ADDITION OF 2x800 MW (1600 MW) COAL BASED ULTRA SUPER CRITICAL… — under forest review, 0 m away
- EXPANSION BY ADDITION OF 2x800 MW (1600 MW) COAL BASED ULTRA SUPER CRITICAL… — environmental approval granted, 0 m away
- 2x 600 MW Sub-Critical Coal Based Thermal Power Plant — initial checks, 50 m away
- Expansion of existing Coal Based Sub-Critical Thermal Power Plant from 2X600… — environmental approval granted, 50 m away
- Splitting of Environmental Clearance granted for 2,860 MW [2X630 MW (Phase-I)… — more information requested, 100 m away
- Jaithari Gobri Sand Mine — cleared for impact study, 3.2 km away
- New Kanya shiksha parishar Jaithari — forest land use approved, 4 km away
More from Mb Power (Madhya Pradesh) Limited in Anuppur
- Splitting of Environmental Clearance granted for 2,860 MW [2X630 MW (Phase-I)… — more information requested
- Expansion of existing Coal Based Sub-Critical Thermal Power Plant from 2X600… — environmental approval granted
All 6 Mb Power (Madhya Pradesh) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.