Quick answers
What is this project?
Proposed Expansion of Balaghat Manganese Ore Mining and Beneficiation plant (ML Area – 182.300 Ha.) from 0.5 Million TPA to 1.2983 Million TPA is a proposed mining project in Surwahi, Balaghat, Madhya Pradesh. The site covers 450.5 acres.
Who is building it?
The applicant is Moil Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Surwahi, Balaghat, Madhya Pradesh.
How big is it?
It has a stated cost of ₹485.1 crore and a site of 450.5 acres.
When was it filed?
The application was filed on 21 Feb 2026.
Project details
| Official title | Proposed Expansion of Balaghat Manganese Ore Mining and Beneficiation plant (ML Area – 182.300 Ha.) from 0.5 Million TPA to 1.2983 Million TPA located at Village(s) Bharveli, Hirapur, Manegoan, Manjhara, Awalajhari and Tawejhari , Tehsil & District- Balaghat, State - Madhya Pradesh by M/s Manganese Ore (India) Ltd. |
|---|---|
| Status | Under environmental review |
| Status since | 10 Oct 2026 |
| Application filed | 21 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Mining |
| Applicant | Moil Limited |
| Land area | 450.5 acres (182.3 ha) |
| Project cost | ₹485.1 crore |
| Village / locality | Surwahi |
| Taluk / tehsil | Balaghat |
| District | Balaghat |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-08793 |
In context
204 applications in Balaghat since January 2022 are in the same category (Mining): 113 approved, 51 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 29 days from filing to approval. At 450.5 acres, this one is larger than 96% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Surwahi, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Balaghat Manganese Ore Mining and Beneficiation plant… — cleared for impact study, 0 m away
- Proposed Bharveli, Awalajhari Manganese Mine Over an Extent of 76.409 Hectares — environmental approval granted, 1.2 km away
- Mining of Manganese Ore (Major Mineral), production capacity of 500 TPA by the… — environmental approval granted, 1.4 km away
- Bhanpur Crusher Stone Quarry Lease — environmental approval granted, 4.1 km away
- Kanki Sand Mining Lease of MOIL Limited over an area of 4.413 Ha, at Khasra… — cleared for impact study, 6.9 km away
- Kanki Sand Mining Lease of MOIL Limited over an area of 4.413 Ha, at Khasra… — lapsed, 6.9 km away
- Kanki Sand Mining Lease of MOIL Limited over an area of 4.413 Ha, at Khasra… — lapsed, 6.9 km away
- Bhatera Sand Quarry — environmental approval granted, 6.9 km away
More from Moil Limited in Balaghat
- Expansion of Manganese Mines From Production Capacity of 1,20,000 to 2,16,000… — under environmental review
- Expansion of Tirodi Manganese Ore Mine From Production Capacity of 3700 Tpa to… — under environmental review
- Expansion of Manganese Mines From Production Capacity of 1,20,000 to 2,16,000… — cleared for impact study
- Proposed Expansion of Balaghat Manganese Ore Mining and Beneficiation plant… — cleared for impact study
- Expansion of Manganese Mines From Production Capacity of 1,20,000 Tpa to… — cleared for impact study
- Expansion of Manganese Mines From Production Capacity of 17000 Tpa to 70000… — environmental approval granted
10 Moil projects in Balaghat
All 25 Moil projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.