What is Developing? Open the mapMap

Environmental approval grantedMining · Balaghat, Madhya Pradesh

Expansion of Manganese Mines From Production Capacity of 17000 Tpa to 70000 Tpa in an Area of 43.353 Ha

Expansion of Manganese Mines From Production Capacity of 17000 Tpa to 70000 Tpa in an Area of 43.353 Ha is an approved mining project in Sukli, Tirodi, Balaghat, Madhya Pradesh. The site covers 107.1 acres. Its stated project cost is ₹8.7 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 21 Feb 2025).

See it on the live map All projects in Balaghat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Manganese Mines From Production Capacity of 17000 Tpa to 70000 Tpa in an Area of 43.353 Ha is an approved mining project in Sukli, Tirodi, Balaghat, Madhya Pradesh. The site covers 107.1 acres.

Who is building it?

The applicant is Moil Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 21 Feb 2025), as of 27 Nov 2026.

Where is it?

In Sukli, Tirodi, Balaghat, Madhya Pradesh.

How big is it?

It has a stated cost of ₹8.7 crore and a site of 107.1 acres.

When was it filed?

The application was filed on 12 Jan 2025.

Project details

Official titleExpansion of Manganese Mines From Production Capacity of 17000 Tpa to 70000 Tpa in an Area of 43.353 Ha at Sitapathore Village, Tirodi Tehsil, Balaghat District, Madhya Pradesh
StatusEnvironmental approval granted
Status since21 Feb 2025
Application filed12 Jan 2025
Approval soughtEnvironmental approval
Application typeExpansion
SectorMining
ApplicantMoil Limited
Land area107.1 acres (43.4 ha)
Project cost₹8.7 crore
Village / localitySukli
Taluk / tehsilTirodi
DistrictBalaghat
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-02955

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 12 Jan 2025 (this page)Environmental approval granted107.1 acres₹8.7 crore
Early planning filed 8 Nov 2023Cleared for impact study107.1 acres₹8.7 crore

In context

204 applications in Balaghat since January 2022 are in the same category (Mining): 113 approved, 51 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 29 days from filing to approval. At 107.1 acres, this one is larger than 87% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 118.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.

Where it is

Sukli, Tirodi, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Moil Limited in Balaghat

10 Moil projects in Balaghat
All 25 Moil projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.