Expansion of Manganese Mines From Production Capacity of 1,20,000 to 2,16,000 Tpa in an Area of 73.567 Ha is a proposed mining project in Ukwa (Ct), Paraswada, Balaghat, Madhya Pradesh. The site covers 181.8 acres.
Who is building it?
The applicant is Moil Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Ukwa (Ct), Paraswada, Balaghat, Madhya Pradesh.
How big is it?
It has a stated cost of ₹269 crore and a site of 181.8 acres.
When was it filed?
The application was filed on 7 Oct 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Manganese Mines From Production Capacity of 1,20,000 to 2,16,000 Tpa in an…
Project details
| Official title | Expansion of Manganese Mines From Production Capacity of 1,20,000 to 2,16,000 Tpa in an Area of 73.567 Ha at Lugma & Ukwa Village, Paraswara Tehsil, Balaghat District, Madhya Pradesh |
|---|---|
| Status | Under environmental review |
| Status since | 25 Nov 2026 |
| Application filed | 7 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Mining |
| Applicant | Moil Limited |
| Land area | 181.8 acres (73.6 ha) |
| Project cost | ₹269 crore |
| Village / locality | Ukwa (Ct) |
| Taluk / tehsil | Paraswada |
| District | Balaghat |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-08940 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 7 Oct 2026 (this page) | Under environmental review | 181.8 acres | ₹269 crore |
| Early planning filed 5 Mar 2026 | Cleared for impact study | 181.8 acres | ₹269 crore |
In context
204 applications in Balaghat since January 2022 are in the same category (Mining): 113 approved, 51 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 29 days from filing to approval. At 181.8 acres, this one is larger than 92% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 938.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.
Where it is
Ukwa (Ct), Paraswada, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Manganese Mines From Production Capacity of 1,20,000 to 2,16,000… — cleared for impact study, 0 m away
- Expansion of Manganese Mines From Production Capacity of 1,20,000 Tpa to… — cleared for impact study, 50 m away
- Ukwa Mine Project. — more information requested, 50 m away
- Validity Extension of Prior Environment Clearance of Lugma-Ukwa Mine of M/s… — environmental approval granted, 50 m away
- Westen Part of Ukwa Manganese block for Manganese Ore (Area- 25.140 ha) — under environmental review, 1.6 km away
- Gudma Manganese Ore Block — forest land use approved, 2.7 km away
- Transfer of Environmental Clearance - "EC issued vide letter No. 1082/SEIAA/18… — environmental approval granted, 5.2 km away
- Bhaiswahi to Jaldidand Under RCPLWEA Scheme — decision issued, 8.3 km away
More from Moil Limited in Balaghat
- Expansion of Tirodi Manganese Ore Mine From Production Capacity of 3700 Tpa to… — under environmental review
- Proposed Expansion of Balaghat Manganese Ore Mining and Beneficiation plant… — under environmental review
- Proposed Expansion of Balaghat Manganese Ore Mining and Beneficiation plant… — cleared for impact study
- Expansion of Manganese Mines From Production Capacity of 1,20,000 Tpa to… — cleared for impact study
- Expansion of Manganese Mines From Production Capacity of 17000 Tpa to 70000… — environmental approval granted
- Expansion of Manganese Mines From Production Capacity of 17000 Tpa to 70000… — cleared for impact study
10 Moil projects in Balaghat
All 25 Moil projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.