Quick answers
What is Sitapathore Mangnese Ore Quarry?
Sitapathore Mangnese Ore Quarry is an approved mining project in Sitapath, Tirodi, Balaghat, Madhya Pradesh. The site covers 10.5 acres.
Who is building it?
The applicant is P.K Shukla.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 10 Nov 2026), as of 27 Nov 2026.
Where is it?
In Sitapath, Tirodi, Balaghat, Madhya Pradesh.
How big is it?
It has a stated cost of ₹2 crore and a site of 10.5 acres.
When was it filed?
The application was filed on 26 Jun 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Nov 2026 |
| Application filed | 26 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | P.K Shukla |
| Land area | 10.5 acres (4.3 ha) |
| Project cost | ₹2 crore |
| Village / locality | Sitapath |
| Taluk / tehsil | Tirodi |
| District | Balaghat |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09142 |
In context
204 applications in Balaghat since January 2022 are in the same category (Mining): 113 approved, 51 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 29 days from filing to approval. At 10.5 acres, this one is smaller than 57% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Sitapath, Tirodi, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Preliminary investigation for Manganese in Sausar Group of rocks in Kharpariya… — forest land use approved, 1.6 km away
- Sitapathore exploration Block — forest land use approved, 1.9 km away
- Expansion of Manganese Mines From Production Capacity of 17000 Tpa to 70000… — environmental approval granted, 2 km away
- Expansion of Manganese Mines From Production Capacity of 17000 Tpa to 70000… — cleared for impact study, 2 km away
- Mining of Manganese (Major Mineral), With Production Capacity of 200 Tpa Over… — environmental approval granted, 2.1 km away
- Preliminary investigation for Manganese in Sausar Group of rocks in… — forest land use approved, 2.1 km away
- MOIL-Sukli Forest for Drilling — forest land use approved, 3 km away
- Sukli Block-B Manganese Ore — forest land use approved, 4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.