Quick answers
What is MOIL-Sukli Forest for Drilling?
MOIL-Sukli Forest for Drilling is an approved survey and exploration project in Sukli, Tirodi, Balaghat, Madhya Pradesh. The site covers 196.6 acres.
Who is building it?
The applicant is Vikash Parida.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 12 Oct 2026), as of 27 Nov 2026.
Where is it?
In Sukli, Tirodi, Balaghat, Madhya Pradesh.
How big is it?
It has a stated cost of ₹5 crore; a site of 196.6 acres and 148 acres (59.9 ha) of forest land.
When was it filed?
The application was filed on 31 May 2026.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 12 Oct 2026 |
| Application filed | 31 May 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Survey & exploration |
| Applicant | Vikash Parida |
| Land area | 196.6 acres (79.6 ha) |
| Forest land | 148 acres (59.9 ha) |
| Project cost | ₹5 crore |
| Village / locality | Sukli |
| Taluk / tehsil | Tirodi |
| District | Balaghat |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-11716 |
In context
5 applications in Balaghat since January 2022 are in the same category (Survey & exploration): 2 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sukli, Tirodi, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining of Manganese (Major Mineral), With Production Capacity of 200 Tpa Over… — environmental approval granted, 900 m away
- Expansion of Manganese Mines From Production Capacity of 17000 Tpa to 70000… — environmental approval granted, 950 m away
- Expansion of Manganese Mines From Production Capacity of 17000 Tpa to 70000… — cleared for impact study, 950 m away
- Sukli Block-B Manganese Ore — forest land use approved, 1.5 km away
- GENERAL EXPLORATION (G-2 STAGE) FOR MANGANESE AND ASSOCIATED MINERALS IN SUKLI… — more information requested, 1.9 km away
- Preliminary investigation for Manganese in Sausar Group of rocks in Kharpariya… — forest land use approved, 2 km away
- Sitapathore exploration Block — forest land use approved, 2.5 km away
- Sitapathore Mangnese Ore Quarry — environmental approval granted, 3 km away
More from Vikash Parida in Balaghat
- Tirodi Manganese Ore Mining Project (ML area 254.593 ha) and expansion in… — under environmental review
- Tirodi Manganese Ore Mining Project (ML area 254.593 ha) and expansion in… — more information requested
- Kanki Sand Mining Lease of MOIL Limited over an area of 4.413 Ha, at Khasra… — lapsed
- Kanki Sand Mining Lease of MOIL Limited over an area of 4.413 Ha, at Khasra… — lapsed
- Kanki Sand Mining Lease of MOIL Limited over an area of 4.413 Ha, at Khasra… — cleared for impact study
- Ukwa Mine Project. — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.