Quick answers
What is this project?
Preliminary investigation for Manganese in Sausar Group of rocks in Kharpariya block, Balaghat District, Madhya Pradesh is an approved project in Kharpariya, Tirodi, Balaghat, Madhya Pradesh. The site covers 370.7 acres.
Who is building it?
The applicant is GEOLOGICAL SURVEY OF INDIA State Unit MP.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 28 Jul 2026), as of 27 Nov 2026.
Where is it?
In Kharpariya, Tirodi, Balaghat, Madhya Pradesh.
How big is it?
It has a stated cost of ₹30 lakh; a site of 370.7 acres and 370.7 acres (150 ha) of forest land.
When was it filed?
The application was filed on 28 Jun 2026.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 28 Jul 2026 |
| Application filed | 28 Jun 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | GEOLOGICAL SURVEY OF INDIA State Unit MP |
| Land area | 370.7 acres (150 ha) |
| Forest land | 370.7 acres (150 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Kharpariya |
| Taluk / tehsil | Tirodi |
| District | Balaghat |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-09841 |
In context
31 applications in Balaghat since January 2022 are in the same category (Other): 6 approved, 18 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 30 days from filing to approval. At 370.7 acres, this one is larger than 82% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kharpariya, Tirodi, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sitapathore exploration Block — forest land use approved, 600 m away
- Expansion of Manganese Mines From Production Capacity of 17000 Tpa to 70000… — environmental approval granted, 1.1 km away
- Expansion of Manganese Mines From Production Capacity of 17000 Tpa to 70000… — cleared for impact study, 1.1 km away
- Mining of Manganese (Major Mineral), With Production Capacity of 200 Tpa Over… — environmental approval granted, 1.4 km away
- Sitapathore Mangnese Ore Quarry — environmental approval granted, 1.6 km away
- MOIL-Sukli Forest for Drilling — forest land use approved, 2 km away
- Preliminary investigation for Manganese in Sausar Group of rocks in… — forest land use approved, 3.2 km away
- Submersible bridge across Doriya Nalla on Kharpadiya - Shivanheti Road In… — lapsed, 3.4 km away
More from GEOLOGICAL SURVEY OF INDIA State Unit MP in Balaghat
- Preliminary investigation for Manganese in Sausar Group of rocks in… — forest land use approved
All 170 Geological Survey of India (GSI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.