Quick answers
What is this project?
Environmental Clearance for production of 9000 Cum/annum of River Sand over Hathuripal Sand Quarry (ML Area 10.72ha) in Bramhani River Bed is an approved mining project in Haturipal, Talcher Sadar, Anugul, Odisha. The site covers 26.5 acres.
Who is building it?
The applicant is Haturipal Sand Quarry.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 21 Nov 2022), as of 27 Nov 2026.
Where is it?
In Haturipal, Talcher Sadar, Anugul, Odisha.
How big is it?
It has a stated cost of ₹20 lakh and a site of 26.5 acres.
When was it filed?
The application was filed on 21 Nov 2022.
Project details
| Official title | Environmental Clearance for production of 9000 Cum/annum of River Sand over Hathuripal Sand Quarry (ML Area 10.72ha) in Bramhani River Bed at village – Hathuripal, Tahasil –Talcher, District- Anugul, Odisha. Lessee- Tahasildar-Talcher Dist-Anugul, Odisha |
|---|---|
| Status | Environmental approval granted |
| Status since | 21 Nov 2022 |
| Application filed | 21 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Haturipal Sand Quarry |
| Land area | 26.5 acres (10.7 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Haturipal |
| Taluk / tehsil | Talcher Sadar |
| District | Anugul |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00051 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 6 Nov 2026 | Initial checks | 26.5 acres | ₹20 lakh |
| Validity extension filed 7 Oct 2026 | Returned to applicant | 26.5 acres | ₹20 lakh |
| New project filed 21 Nov 2022 (this page) | Environmental approval granted | 26.5 acres | ₹20 lakh |
In context
108 applications in Anugul since January 2022 are in the same category (Mining): 50 approved, 25 filed or under review, and 33 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 26.5 acres, this one is smaller than 65% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Haturipal, Talcher Sadar, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for production of 9000 Cum/annum of River Sand over… — initial checks, 0 m away
- Environmental Clearance for production of 9000 Cum/annum of River Sand over… — returned to applicant, 0 m away
- Haturipal Brahmani Sand Quarry over an area of 11.80 Acre or 4.77 Ha — environmental approval granted, 550 m away
- Proposed Intake Water Pipeline Corridor for Ttps Expansion Project(2 X 660MW)… — forest land use approved, 1.9 km away
- Expansion of Talcher Thermal Power Project from existing 1320 MW (Stage-III:… — under environmental review, 3 km away
- Dhobapal Sand Quarry over an area of 18.00 acres or 7.28 Hectares bearing… — not approved, 3.6 km away
- Application for Amendment of Ec for Mining of Sand From Nizagarhzami Sand… — environmental approval granted, 3.8 km away
- Application for Amendment of Ec for Mining of Sand From Nizagarhzami Sand… — not approved, 3.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.