Quick answers
What is this project?
Haturipal Brahmani Sand Quarry over an area of 11.80 Acre or 4.77 Ha is an approved mining project in Haturipal, Talcher Sadar, Anugul, Odisha. The site covers 11.8 acres.
Who is building it?
The applicant is Gadadhar Setha.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 22 Jan 2025), as of 27 Nov 2026.
Where is it?
In Haturipal, Talcher Sadar, Anugul, Odisha.
How big is it?
It has a site of 11.8 acres.
When was it filed?
The application was filed on 16 May 2024.
Project details
| Official title | Haturipal Brahmani Sand Quarry over an area of 11.80 Acre or 4.77 Ha in village Haturipal under Odapada Tahasil of Dhenkanal District Odisha |
|---|---|
| Status | Environmental approval granted |
| Status since | 22 Jan 2025 |
| Application filed | 16 May 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Gadadhar Setha |
| Land area | 11.8 acres (4.8 ha) |
| Village / locality | Haturipal |
| Taluk / tehsil | Talcher Sadar |
| District | Anugul |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-01225 |
In context
108 applications in Anugul since January 2022 are in the same category (Mining): 50 approved, 25 filed or under review, and 33 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 11.8 acres, this one is smaller than 80% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Haturipal, Talcher Sadar, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for production of 9000 Cum/annum of River Sand over… — initial checks, 550 m away
- Environmental Clearance for production of 9000 Cum/annum of River Sand over… — returned to applicant, 550 m away
- Environmental Clearance for production of 9000 Cum/annum of River Sand over… — environmental approval granted, 550 m away
- Proposed Intake Water Pipeline Corridor for Ttps Expansion Project(2 X 660MW)… — forest land use approved, 2.3 km away
- Expansion of Talcher Thermal Power Project from existing 1320 MW (Stage-III:… — under environmental review, 3.6 km away
- Dhobapal Sand Quarry over an area of 18.00 acres or 7.28 Hectares bearing… — not approved, 4.1 km away
- Application for Amendment of Ec for Mining of Sand From Nizagarhzami Sand… — environmental approval granted, 4.3 km away
- Application for Amendment of Ec for Mining of Sand From Nizagarhzami Sand… — not approved, 4.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.