Cleared for impact studyIndustry · Jharsuguda, Odisha

Expansion of existing implemented project [1x225 m3 MBF (1,88,000 TPA), 1x40 m2 Sinter Plant (4,60,000 TPA), 8x100 TPD DRI Plant (2,40,000 TPA), 2x30 T I.F. SMS (1,07,700 TPA), 1x0.7 MTPA Coal washery, 2x0.12 MTPA Nonrecovery type Coke Oven Plant, 1x0.6 MTPA Pellet plant, 2x4,000 Nm3/hr PGP, 16 MW AFBC, 8x1.0 MW (8.0 MW) WHRB Based CPP from existing DRI Plant] to Integrated Steel Plant of capacity 1.7 Million TPA (Finished Steel) with 275 MW CPP and 1.25 million TPA Cement Grinding Unit

Expansion of existing implemented project [1x225 m3 MBF (1,88,000 TPA), 1x40 m2 Sinter Plant (4,60,000 TPA), 8x100 TPD DRI Plant (2,40,000 TPA), 2x30 T I.F. SMS (1,07,700 TPA), 1x0.7 MTPA Coal washery, 2x0.12 MTPA Nonrecovery type Coke Oven Plant, 1x0.6 MTPA Pellet plant, 2x4,000 Nm3/hr PGP, 16 MW AFBC, 8x1.0 MW (8.0 MW) WHRB Based CPP from existing DRI Plant] to Integrated Steel Plant of capacity 1.7 Million TPA (Finished Steel) with 275 MW CPP and 1.25 million TPA Cement Grinding Unit is a proposed industrial project in Mar>Kuta, Jharsuguda, Odisha. The site covers 266.7 acres. Its stated project cost is ₹2,461.3 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 2 Nov 2023).

See it on the live map All projects in Jharsuguda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of existing implemented project [1x225 m3 MBF (1,88,000 TPA), 1x40 m2 Sinter Plant (4,60,000 TPA), 8x100 TPD DRI Plant (2,40,000 TPA), 2x30 T I.F. SMS (1,07,700 TPA), 1x0.7 MTPA Coal washery, 2x0.12 MTPA Nonrecovery type Coke Oven Plant, 1x0.6 MTPA Pellet plant, 2x4,000 Nm3/hr PGP, 16 MW AFBC, 8x1.0 MW (8.0 MW) WHRB Based CPP from existing DRI Plant] to Integrated Steel Plant of capacity 1.7 Million TPA (Finished Steel) with 275 MW CPP and 1.25 million TPA Cement Grinding Unit is a proposed industrial project in Mar>Kuta, Jharsuguda, Odisha. The site covers 266.7 acres.

Who is building it?

The applicant is Orissa Metaliks Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 2 Nov 2023), as of 27 Nov 2026.

Where is it?

In Mar>Kuta, Jharsuguda, Odisha.

How big is it?

It has a stated cost of ₹2,461.3 crore and a site of 266.7 acres.

When was it filed?

The application was filed on 20 Sept 2023.

Project details

StatusCleared for impact study
Status since2 Nov 2023
Application filed20 Sept 2023
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorIndustry
ApplicantOrissa Metaliks Private Limited
Land area266.7 acres (107.9 ha)
Project cost₹2,461.3 crore
Village / localityMar>Kuta
Taluk / tehsilJharsuguda
DistrictJharsuguda
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-00259

In context

38 applications in Jharsuguda since January 2022 are in the same category (Industry): 23 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 266.7 acres, this one is larger than 62% of them.

11 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mar>Kuta, Jharsuguda, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to Talabira II & III: A 23-Million-Tonne-a-Year Coal Mine for Jharsuguda and Sambalpur, Odisha (9.7 km away).

Other projects nearby

More from Orissa Metaliks Private Limited in Jharsuguda

4 Orissa Metaliks projects in Jharsuguda
All 9 Orissa Metaliks projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.